![Hanna Instruments HI 21 Series Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/hanna-instruments/hi-21-series/hi-21-series_instruction-manual_3712571055.webp)
55
RELAYS AND LEDS
Relays and LEDs selftests are executed as follows:
First all of the relays and LEDs are switched off, then they are
switched on one at a time for a few seconds and cyclically.
User can interrupt the otherwise endless cycle, as indicated
by the scrolling message, by pressing a key.
Note
Relays and LEDs test has to be carried out with the relay
contacts disconnected from external plant devices.
WATCHDOG
When a dead loop condition is detected a reset is auto-
matically invoked.
The effectiveness of watchdog capability can be tested
through one of the special setup items. This test consists of
executing a dummy dead loop that causes watchdog reset
signal to be generated.