background image

Connect the device to voltage 
sources, which correspond to the 
electrical requirements on the label 
attached to the device.

Check the wall outlet is earth-
grounded, surge-protected and 
can supply enough power.

Connect the power cable to the 
distribution box, or install the plug 
and socket that are packed with 
the device.

Switch off the device after use.
Unplug the power plug before
cleaning or unused for a long
period of time.

Check the Line Voltage

Grounded Outlet

Power Connection

Switch Off the Device

Quick Guide

Supra R22 / Supra R12

Cat. No. : SU-R22 / SU-R12

Maintenance

Electrical safety

A2.0-36 
A10-12
A15-12 
A15c-12  
A50-6 
A50c-6 

36 x 1.5/2.0 mL / Max. 18k 
12 x 10 mL / Max. 22k 
12x 15 mL  / Max. 22k
12 x 15 mL conical / Max. 17k  
6 x 50 mL / Max. 22k  
6 x 50 mLconical / Max. 17k  

6 x 250 mL / Max. 12k
6 x 500 mL / Max. 10k 
4 x 1,000 mL / Max. 8k
6 x 1,000 mL / Max. 7k

A250-6      
A500-6 
A1000-4  
A1000-6 

Rotors

Allow a safety clearance of 30 cm 
around the centrifuge during 
operation.

Remove Dust

Empty the Condensation Water

Allow a Safety Clearance of 30 cm

Emergency Lid Open

30 cm

30 cm

30 cm

If the centrifuge lid cannot be opened, insert the 
provided T-wrench into the emergency  release 
hole on the right side of the device and press it. 
(Before activating emergency open, switch off 
the device and wait for the rotor to stop.)

Remove any dust from the 
ventilation slits on the right side
of the device.

Empty the condensation water 
regularly by removing the drain cap 
on the left side of the device.

8 x 50 mL / Max. 20k 
6 x 85 mL / Max. 20k 
6 x 250 mL / Max. 12k 
6 x 500 mL / Max. 9k 
4 x 1,000 mL / Max. 8k 

A50-8
A85-6
A250-6
A500-6   
A1000-4

Supra R22

Supra R12

Cautions for Use

Inspect the rotor, chamber, 
rotor & accessories for foreign objects.

Wipe up the moisture in the chamber with 
a dry cloth after use. Keep the lid open 
when not in use.

Clean the chamber and rotor 
by wiping with a cloth soaked in mild 
detergent and dry completely.

Keep the Chamber Dry

Cleaning

Load tubes symmetrically into the rotor 
with identical amount.

Load Tubes Symmetrically

Check the rotor, buckets and tubes are free 
of scratch and crack before operation.

Check the Accessories for Abnormalities

After relocating the device or loading the 
rotor, balance them by using a leveler. If 
necessary, level the device by adjusting the 
‘Leveling foot’ on the bottom of the device.

Balancing the Centrifuge and Rotor 

3.4KVA 

(Supra R22)

3.0KVA 

(Supra R12)

220~240V 50/60Hz 

Rev.1

Proudly made by Jiyoung Shim, Hyewon Jeong 

Order & Inquiry l +82-2-3472-0727  l  [email protected] l www.ihanil.com
Service  l +82-2-3452-8966 l [email protected]

Before Operation

After Operation

Отзывы: