63
1
2
Line up the dome with the fuselage and slowly working the dome into the
studs. If any of the clear inserts came out, continue installing the dome and
insert the clear insert after dome is on the fuselage. Apply some thread lock
to the studs.
Install the vibration dampeners on the dome. Insert the clear tubes in the
center of the vibration dampeners.
Insert the washer over the studs and using a 7mm nut driver, tighten the nuts.
If using a socket, make sure not to overtighten the nuts. Using a nut driver as
shown in the picture above is better.
3
engine dome installation • • •
Содержание Composite QQ Yak-54 2.6m
Страница 99: ...99 ...