PARTS LIST 12’ GAZEBO
❑
10 pcs. Plywood Triangular Roof Panels
❑
2 pcs. Plywood Square Roof Panels
2" Nail
3/4"
Marks
Rough sawn
Cedar side
2" Nail
Center Panels on or in
between 3/4" Marks
3/4"
10' or 12' Roof Panel
Roof Panels Should
Overhang about 1"
3/4"
3/4"
Plywood side
7
INSTALLING ROOF PANELS
FOR 10’ & 12’ GAZEBO
❑
8 pcs. Plywood Triangular Roof Panels
❑
2 pcs. Plywood Square Roof Panels
7-A: When installing the Roof Panels, the rough sawn cedar side should be facing to the inside of
your Gazebo. Along each Rafter, place a mark 3/4” in on each Rafter to help center Roof Panels as
shown in Fig. 1 and Fig. 2. Set first Roof Panel in place on top of Rafters, making top of Roof Panels
line up where Rafter and Ridge Block meet and nail with one 2” nail at the top of Roof Panel. Once
top is nailed, make sure Roof Panel at bottom is centered between 3/4” marks on both Rafters. Panel
should overhang about 1”. Once Roof panel is aligned nail with two 2” nails at bottom corners. Go to
step 7-B.
7-A
NOTE: Make certain the rough cedar sawn
side of each Roof Panel is facing
down during assembly.
Fig.2
Fig.1
PARTS LIST 10’ GAZEBO
* For 14’ Models, continue with next page.