background image

LIMITED CONDITIONAL WARRANTY*

Backyard Storage Solutions, LLC warrants the following:

1. 

Every product is warranted from defects in workmanship and manufacturing for 1 year.

2. 

All accessories, hardware and metal components are warranted for 2 years.

3. 

All Oriented Strand Board (OSB) is warranted for 2 years

4. 

Siding and Trim is warranted for 15 years.

5.

LP Prostruct® Flooring is warranted for 10 years

6. 

Cedar lumber is warranted for 15 years.

7. 

Preserved Pine is warranted for 10 years.

8. 

Redwood is warranted for 10 years.

9. 

Metal Roof is warranted for 25 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part.  In no event shall Backyard Storage Solutions, LLC 

pay the cost of labor or installation or any other costs related thereto.  All warranties are from date of purchase.  If a cash refund is paid 

on an affected part, it will be prorated from the date of purchase.

CONDITIONS

The warranty is effective only when:

1. 

The unit has been erected in accordance with the assembly instructions. 

2. 

The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.

3. 

The failure occurs when the unit is owned by the original purchaser.

4. 

Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and

 

notification of the failure in writing within the warranty period specified above.

5. 

Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to

 

inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTS

Storage Buildings

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or 

solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of 

assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of 

siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.  

Gazebos & Pergolas

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit.  This includes treating all of 

the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior 

oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly 

and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement.  

The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the 

ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will 

Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that 

are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper 

maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for 

any labor costs incurred to construct your unit.

This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURE

To make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected].

 Please have ready the information below when you call or include the information in your email:

1. 

The model and size of the product.

2. 

A list of the part(s) for which the claim is made.

3. 

Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice or receipt.

4. 

Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to:

 

Backyard Storage Solutions, LLC

 

Attn: Customer Service

 

1000 Ternes

 

Monroe, MI 48162

 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.

IMPORTANT:  This is your warranty certificate.

15Y PSS BB GEN LDR:  3/20/2019

Содержание Meridian 8' x 12' Gable 16698

Страница 1: ...number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance March through November M F 8 00 AM to 9 00 PM EST 6 00 PM PST Saturday 8 30 AM to 5 00...

Страница 2: ...This page intentionally left blank...

Страница 3: ...PARTS Inventory all parts listed on pages 4 6 ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3 for required and optional materials and quantities 11 05 2020 AS...

Страница 4: ...n You have finished the assembly or installation Level Gloves Clamps Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the ma...

Страница 5: ...ou may want to construct a heavy duty floor frame by adding additional floor joists shown below as shaded Below is a list of additional materials not included If your shed was purchased with a floor s...

Страница 6: ...2 x 4 x 89 5 1 x 10 2 x 226 1 cm TP x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm VX x2 2 x 6 x 96 5 1 x 15 2 x 243 8 cm UWA x2 19 32 x 2 1 2 x 32 1 5 x 6 3 x 81 3 cm EGB x2 19 32 x 2 1 2 x 18 5 8 1 5 x 6 3 x 4...

Страница 7: ...Roof Panels are 7 16 1 1 cm thick 13 7 8 x 96 35 2 x 243 8 cm x2 48 x 96 121 9 x 243 8 cm x2 47 7 8 x 48 121 6 x 121 9 cm x2 13 7 8 x 48 35 2 x 121 9 cm x2 x2 x2 x1 LEFT DOOR x1 RIGHT DOOR x8 3 8 x 4...

Страница 8: ...cm 1 1 4 3 2 x 160 x 65 x 55 1 1 2 3 8 cm 2 5 0 cm 3 7 6 cm 3 4 1 9 cm x 120 x 88 x 48 x 8 2 5 0 cm 1 2 5 cm NOTE If you are using a nail gun nails may be used where screws are shown for quicker assem...

Страница 9: ...r drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 12 10 2 x 10 2 x 36...

Страница 10: ...your kit on a concrete slab refer to the diagram below A treated 2 x 4 5 1 x 10 2 cm sill plate is required when installing your shed on concrete Hint Purchase full length treated lumber Use a high qu...

Страница 11: ...y measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 173 1 16 439 6 cm When the frame is level and square secure on...

Страница 12: ...l after installing floor panels Re level if needed The floor should be used as a level work surface for wall construction Organize your wall sections during sub assembly to avoid over handling of the...

Страница 13: ...ls in the pattern shown Your door header is now assembled FINISH 1 BEGIN 1 OSB ASSEMBLED END VIEW TCA TCA 2 Flip header assembly over and nail as shown on the other side Flush Flush x2 2 x 4 x 51 5 1...

Страница 14: ...ALL WITH DOOR CENTERED GO TO Page 15 TO BEGIN BUILDING YOUR WALLS OPTIONAL DOOR OFFSET ON 12 EAVE WALL 12 EAVE WALL WITH DOOR IF YOU CHOOSE THE EAVE WALL WITH DOOR OFFSET GO TO Page 17 TO BEGIN BUILDI...

Страница 15: ...RTS REQUIRED TM TM SZ SZ TM x2 2 x 4 x 72 5 1 x 10 2 x 182 9 cm YFA x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA YFA Pre Assembled Header Orient parts on edge on floor Measure and mark Maintain a 48 121...

Страница 16: ...93 cm x2 Place 2 23 7 8 x 76 panels and 3 7 8 x 48 panel on wall frame as shown Flush all panels to top plate and flush the 23 7 8 x 76 panels along edge of door frame Panels will overlap the frame ap...

Страница 17: ...asure and mark Secure parts with 2 3 nails at each mark and 4 3 nails at seams HINT For easier nailing stand on frame 3 7 6 cm Nails x10 TM 2 x 4 x 72 5 1 x 10 2 x 182 9 cm SP x1 2 x 4 x 48 5 1 x 10 2...

Страница 18: ...panels and 3 7 8 x 48 panel on wall frame as shown Flush all panels to top plate and flush the 48 x 76 panels along edge of door frame Carefully flip the 12 wall over 2 6 15 2 cm 48 121 9 cm 48 121 9...

Страница 19: ...T TM x6 SP TM TM Orient parts on edge on floor as shown Measure and mark Secure parts with 2 3 nails at each mark HINT For easier nailing stand on frame 3 7 6 cm Nails x8 TM 2 x 4 x 72 5 1 x 10 2 x 18...

Страница 20: ...x 76 panels along edge of door frame Carefully flip the 12 wall over 2 4 6 15 2 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 12 30 5 cm Maintain a 48 121 9 cm door opening using OO as a temporar...

Страница 21: ...96 243 8 cm 120 304 8 cm 72 182 9 cm 72 182 9 cm TM x7 TM TM TP SP BEGIN 1 Orient parts on edge on floor as shown Measure and mark Secure parts with 2 3 nails at each mark and 4 3 nails at seams HINT...

Страница 22: ...art inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you...

Страница 23: ...ond 12 wall if your door is on the 8 gable side You have finished building your eave wall s FINISH x2 3 8 x 48 x 76 1 x 121 9 x 193 cm 4 Install 2 48 x 76 panels flush to installed panels and flush to...

Страница 24: ...2 x 226 1 cm TM x3 2 x 4 x 72 5 1 x 10 2 x 182 9 cm Orient parts on edge on floor as shown Measure and mark Secure parts with 2 3 nails at each mark IF YOUR DOOR IS CENTERED ON THE 12 EAVE WALL YOU WI...

Страница 25: ...rement on the wall stud Panels will overlap the frame approximately 3 1 2 8 9 cm at each side Secure panels with 2 nails spaced 6 apart along edges and 12 inside panel 2 FINISH You have finished build...

Страница 26: ...24 B GABLE WALL PARTS REQUIRED TM x3 SZ SZ 1 1 2 3 8 cm BEGIN 1 3 7 6 cm Nails 3 7 6 cm x12 SZ x2 2 x 4 x 89 5 1 x 10 2 x 226 1 cm TM x3 2 x 4 x 72 5 1 x 10 2 x 182 9 cm Orient parts on edge on floor...

Страница 27: ...the gauge block GAA to maintain 3 4 measurement on the wall stud Panels will overlap the frame approximately 3 1 2 8 9 cm at each side Secure panels with 2 nails spaced 6 apart along edges and 12 insi...

Страница 28: ...RED ON 12 EAVE WALL A GABLE WALL B GABLE WALL OPTIONAL DOOR OFFSET ON 12 EAVE WALL STANDARD DOOR LOCATED ON 8 GABLE WALL The following steps show how to stand and secure your walls These instructions...

Страница 29: ...rlap is to the bottom OO BEGIN 1 1 2 5 cm 3 7 6 cm Screws D O O R D O O R Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A 2 Your 12 wall is now...

Страница 30: ...nto floor frame Fig C Nail panels to back wall stud with 1 1 2 nails ENSURE PANEL CORNERS ARE FLUSH Your gable wall is now installed FINISH 3 7 6 cm Nails 2 5 1 cm x18 1 1 2 3 8 cm x11 2 5 1 cm x2 PAR...

Страница 31: ...wall bottom and top plates Fig B Fig A Secure wall to bottom plate rst ENSURE PANEL CORNERS ARE FLUSH BEGIN 1 2 2 5 1 cm x2 Flush 2 5 1 cm Screw Fig B 2 5 1 cm Screw Fig A Center 12 wall on the 144 3...

Страница 32: ...part Your 12 wall is now installed FINISH 6 15 2 cm 3 7 6 cm Nails 1 1 2 3 8 cm x11 Secure gable wall top plate with 1 3 screw toe screwed at the corner at an angle as shown Fig D 5 3 Nail lower edge...

Страница 33: ...2 wall studs with 1 1 2 nails ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH REMOVE TEMPORARY BRACING CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING 2 5 1 cm x10 1 1 2 3 8 cm x22...

Страница 34: ...s Fit base of rafter flush to back wall studs and wall panels AL Temporary Support Flush at peak BEGIN 1 Flush to panel Flush to panel 2 Place 2 rafters TZA on top of temporary support AL and flush to...

Страница 35: ...s in rafter ends Fig A Install single gusset rafters at each end with gusset facing inward 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 3 8 61 9 cm 24 3 8 61 9 cm Fig A Fig B Flush to outside of panel Flush...

Страница 36: ...2 3 8 cm Orient parts AL on the flat side as shown Place left gable panel as shown Secure with 1 1 2 nails as shown 1 BEGIN 2 Place right gable panel flush to left panel Secure with 1 1 2 nails as sh...

Страница 37: ...p plate with 2 nails spaced 6 apart Continue securing panels to rafter with 2 nails spaced 6 apart Working inside secure gable unit with 2 3 screws toe screwed into AL at an angle as shown Fig A 3 Mea...

Страница 38: ...temporary support OO using 3 screws Attach temporary support GAA at bottom using 1 1 4 screws 3 8 1 cm 3 8 1 cm GREEN RED GAA OO 3 7 6 cm Screws x4 3 7 6 cm x4 PARTS REQUIRED x1 x1 Left Door Right Doo...

Страница 39: ...t wall panels Fig A OO Center doors in door opening as shown Fig B 2 Remove temporary supports and check that the doors open properly Fasten hinge boards to wall framing and floor with 10 3 screws as...

Страница 40: ...s at seams Center trim ZB over doors and secure with 5 2 finishing nails into framing 3 4 1 9 cm Screws CENTER ZB Fig B x5 2 5 1 cm INSIDE OF DOOR 3 4 1 9 cm Screws from behind Door Trim Hinge Board F...

Страница 41: ...Screws Fig B OO IT IS IMPORTANT TO HOLD THESE DIMENSIONS x2 12 30 5 cm Approximately BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B...

Страница 42: ...le is now installed FINISH Pre drill 1 4 hole at mark Finish hole using 1 2 drill bit Position hardware in hole and secure with screws as shown 2 Measure and mark position on right door as shown x2 1...

Страница 43: ...Fig A Fig B OO OO Place bolt on OO in open position with bolt end 1 2 1 3 cm up from floor Bolt is open when loop is connecting base Fig B Mark and pre drill holes for screws Install bolt with screws...

Страница 44: ...e top corner is flush to the peak Fig B and there is a 1 2 measurement on the gable end rafter Fig C Secure panel with 2 2 nails in the corners 2 Place the 48 x 96 panel on rafters with a 3 4 measurem...

Страница 45: ...Measurements are to outside of rafter Fig D 2 5 1 cm Nails Maintain spacing between the center of the rafters at the lower edge of the panels Fig D Secure panels with 1 2 nail into each rafter Move to...

Страница 46: ...and flush to the installed panels Secure panel with 1 2 nail in each corner 6 PARTS REQUIRED ROOF PANELS x8 2 5 1 cm 3 4 GAUGE BLOCK 2 5 1 cm Nails 13 7 8 x 96 47 7 8 x 48 3 4 1 9 cm Fig A Gauge Block...

Страница 47: ...w installed Repeat STEPS to install roof panels on the opposite side FINISH Secure all roof panels with 2 nails spaced 6 apart on edges and 12 apart inside panel 7 PARTS REQUIRED ROOF PANELS 2 5 1 cm...

Страница 48: ...s spaced evenly BEGIN 1 FINISH Your gable trim pieces are now assembled GABLE TRIM Repeat steps to assemble trim for opposite side NXC x4 2 x 4 x 62 3 16 5 1 x 10 2 x 158 cm HUL x2 19 32 x 3 1 2 x 62...

Страница 49: ...mbled gable trim pieces flush to roof panels Fig A Secure gable pieces with 2 screws spaced evenly Pre Assembled Pre Assembled BEGIN 1 FINISH Your gable trim is now installed GABLE TRIM 2 5 1 cm x24 2...

Страница 50: ...venly spaced and following the pattern shown BEGIN 1 FINISH Your eave soffits are now installed EAVE SOFFIT 1 1 4 3 2 cm Screws 9 1 2 24 1 cm APPROX Flush Flush 1 1 4 3 2 cm x78 AS x2 2 x 6 x 49 1 2 5...

Страница 51: ...hing nails evenly spaced BEGIN 1 FINISH Your gable trim is now installed GABLE FASCIA Repeat steps for opposite side of shed Flush at peak Flush Flush x28 2 5 1 cm 2 5 1 cm Finishing Nails YOR x1 19 3...

Страница 52: ...soffit with 2 finishing nails evenly spaced BEGIN 1 FINISH Your eave trim is now installed EAVE FASCIA Repeat steps for opposite side of shed x18 2 5 1 cm 2 5 1 cm Finishing Nails JUB BSA JUB x1 19 32...

Страница 53: ...e soffit and flush along seam of installed corner trim Fig C Secure with 2 finishing nails spaced evenly 2 FINISH Your corner trim is now installed Repeat STEPS 1 2 for each corner of shed CORNER TRIM...

Страница 54: ...llar ties JF on 2nd rafters from each gable HINT For best appearance install collar tie on rafter facing away from a doorway Secure collar ties with 2 nails as shown Your collar ties are now installed...

Страница 55: ...53 x2 GABLE VENTS PARTS REQUIRED FINISH BEGIN 1 Install 1 vent in each gable Caulk behind vent flanges Your gable vents are installed Secure with 1 screws x8 1 2 5 cm...

Страница 56: ...ing 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 7 6 cm OVERLAP Flush Flush PARTS REQUIRED PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Tri...

Страница 57: ...at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge BEGIN 1 2 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhan...

Страница 58: ...ling Look for either of the following If the rain slot of the shingle installed over the bend is ABOVE the bend and 3 to 4 of it overhangs down over the bend continue shingling up to the peak You have...

Страница 59: ...5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak using a utility knife Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sid...

Страница 60: ...se cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 c...

Страница 61: ...2 cm between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ri...

Страница 62: ...3 8 NG 31 1 2 X 48 LFT GABLE PANEL w VENT HOLE K 48003108244 8 0 0 0 2 1 1 0 2 1 5 7 K N R O C 4 3 5 7 X 4 3 1 G N 8 3 m i r T r e n r o C Horizontal Door Rails 19 32 TST 2 1 2 X 18 5 8 RAIL UT1810020...

Страница 63: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solu...

Отзывы: