55
• Follow directions provided by manufacturer and these instructions.
SHINGLES
- NOT INCLUDED -
Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE:
If you have installed drip edge install shingles flush to drip edge.
Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.
BEGIN
1
2
TABS UP
Shingle overlaps
roof decking.
1" (2,5 cm) overhang
past roof deck.
1" (2,5 cm) overhang or
flush with drip edge.
(4) Nails
2
BACK OF
SHED
FRONT OF
SHED
FRONT OF
SHED
BACK OF
SHED
Notch
- or -
Drip Edge
Notch
Roof Deck
1"
(2,5 cm)
Flush with starter row.
Flush with starter row.
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
1"
(2,5 cm)
NAILS
Sealing Strip
1"
(2,5 cm)
1/2"
(1,3 cm)
Half A Rain Slot
Notch
Notch
Full Rain Slot
Содержание Meridian 8' x 12' Gable 16698
Страница 2: ...This page intentionally left blank...