3
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
DRIP EDGE ..................... 50 Feet
#15 ROOFING FELT
To cover 116 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM & DOORS .............. 3 Quarts
Use 100% acrylic latex exterior paint.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
This floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by
adding additional floor joists (shown below as shaded).
Below is a list of additional materials (not included):
x2
x8
2 x 4 x 8' (5 x 10 x 243,8 cm) Treated Lumber
Cut to (2) 2 x 4 x 89-5/8" (5 x 10 x 227,6 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed includes a complete floor.
• See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor,
as this will vary depending on your specific site.
Optional 12" (30,5 cm) spacing
Standard 16" (40,7 cm) spacing
Содержание GABLE 8'x10'
Страница 2: ...This page intentionally left blank...