PARTS REQUIRED:
ROOF PANELS
2" (5,1 cm)
DOOR
DOOR
Flush at peak
Fig. B
Flush at peak
Fig. B
3/4"
(1,9 cm)
Fig. C
9-3/4" x 23-7/8"
Install
9-3/4"x 23-7/8"
roof panel flush
to installed panel and flush at rafter peak
(Fig. B)
.
Secure with (2) 2" nails into panel
corners, as shown.
3
Two Nails
Two Nails
4
Move to the opposite end of panel.
Maintain panel flush at peak
(Fig. B)
.
Use
GAA
gauge block for 3/4" measurement along
outside edge of gable panel
(Fig. C)
.
Secure panel with (2) 2" nails
in the corners.