background image

12/06/2007

- BEFORE YOU BEGIN -

Includes 8’x7’8-5/8” (244x235 cm)
Building Instructions

We manufacture kits from select construction grade lumber and engineered wood products.  Construction grade
lumber, a product cut from trees, has many natural characteristics and blemishes that may be present in some of
the pieces you receive in your kit. Natural characteristics and blemishes in construction lumber may include knots,
torn wood grain along edges, minor cracks/splits, twists, limited bark along edges and pitch pockets that may
exude sap. Be assured that the individual parts have been cut and inspected to remove as many of the wood’s
natural, less appealing characteristics as possible. These characteristics and/or blemishes will not affect the
strength, durability, or structural integrity of the finished product. Generally, the exterior trim parts selected for
your kit are graded from only one side and should be installed with the most attractive side outward.  Our limited
warranty does not cover the natural characteristics and blemishes that occur with construction grade lumber
products.

- ANTES DE EMPEZAR -

Customer Service
(Servicio al cliente)
1-800-221-1849
1000 Ternes  Drive
Monroe, MI 48162

Tools required

(Herramientas
necesarias)

 

Hammer

(Martillo)

 Phillips

Screwdriver
(Desarmador cruz)

 Level

(Nivel)

 Ladder

(Escalera)

 Pencil

(Lápiz)

 Tape Measure

(Cinta métrica)

 Utility Knife

(Navaja)

 Paint Tools

(Herramientas
 para pintar)

 Caulk Gun

(Pistola para
masillado)

 Wood Glue

(Pegamento para
madera)

Optional Tools

(Herramientas
opcionales

)

 Electric Drill w/

#2 Phillips Tip
(Taladro eléctrico
Broca “Phillips”)

 Chalk Line

(Línea de marcar)

 Square

(Escuadra)

 Nail Pouch

(Bolsillo para
clavos)

Base

Building/Edificios

8’x7’8-5/8”

(244x235 cm)

#16616

Instrucciones para edificios de
8’x7’8-5/8” (244x235 cm)

Fabricamos nuestros equipos de madera elaborada y de productos maquinados de madera.  La madera
elaborada, producto de árboles, tiene muchas características e imperfecciones naturales que puedan
tener algunas piezas contenidas en el equipo. Estas imperfecciones y características pueden incluir
nudos, grano rasgado sobre el borde, rajas/grietas pequeñas, torsiones, cortezas en el borde, y bolsos
que exuden savia. Asegurams que hemos cortado e inspeccionado las partes individuales para eliminar
las características naturales menos atractivas posibles. Estas características y/o imperfecciones no
afectarán la fuerza, durabilidad ni la integridad estructural del producto final. Po lo general, las piezas de
moldura exterior seleccionadas para su equipo se elaboran de un solo lado y deben ser instaladas con
la parte más atractiva por fuera. Nuestra garantía limitada no cubre las características e impefecciones
que ocurren con los productos de madera elaborada.

Marco Series

8’ Wide Gable

Techo a dos aguas 8’

First...

 

Check with your local building authority before erecting.

 

Read instructions thoroughly before you begin.

Building Codes

 

Our buildings are designed to meet most local and national

   U.S. codes and are not meant to be used for living space.

 

General construction drawings can be provided.

Check All Parts

 

If a part is missing, circle the part in question and call.

● 

 

Please note the primer color may vary on siding and

   trim parts. This is a factory applied primer intended for
   preparing your building for painting. This is NOT a finish
   coat. This primer color variation will not affect the look of
   your building once painted.

Important

 

Lumber is graded from one side, use most attractive

   face to the outside.

 

In a drawing, a dotted line represents a part hidden from

    view (like a part under a panel).

Assistance required

 

Assistance is necessary to handle, fit, and secure

    some components.

Squareness is very Important!

 

Keep 90° corners and 90° perpendiculars throughout

   the assembly to ensure all components fit together.

Check foundation size

 

Before starting on your foundation, make sure you are

   building the correct size foundation for your building.

Safety!

●  

Check for protruding nailspound any protruding

  nails into the wood or cut them off flush

Always wear OSHA-APPROVED safety

glasses throughout assembly process

Primero...

 

Consulte la autoridad de construcción local antes de

construir el edificio.

 

Lea las instrucciones completamente antes de empezar.

Códigos de Construcción

 

Hemos diseñado nuestros edificios a que conformen con

todos los códigos de construcción locales y nacionales.  Los
edificios no están proyectados como residencia.

 

Se disponen planes generales de construcción.

Compruebe todas las piezas

 

Si falta una pieza, indícala con un círculo y llámenos.

 

 

Aviso:  El color del imprimador puede variar en la covertura

y las partes de la moldura.  Este imprimador se aplica en la
fábrica y es para preparar  su edificio para pintar.  NO es una
capa de pintura terminada.  La variación en el color del
imprimador no afectará la apariencia de su edificio al pintarlo.

Importante

 

La Madera está elaborada en un solo lado. Use el lado más

atractivo en el exterior.

 Si falta una pieza, póngale un círculo y llámenos.

 En un dibujo una línea punteada representa una pieza no

   vista (por ejemplo, una pieza debajo de un panel)

Ayuda requerido

 

Seleccione un sitio nivelado.

 

Será necesario pedir ayuda para manejar, unir, y reforzar

algunas piezas.

¡Es preciso escuadrar el edificio!

 

Mantenga ángulos de 90° en las esquinas y los

perpendiculars durante la construcción para asegurar que
todas las piezas se unen correctamente.

Comprueba las dimensiones de la

cimentación.

 

Compruebe que las dimensiones de la cimentación son las

correctas para el edificio.

¡Seguridad!

●  

Inspeccione para clavos sobresalientes; hinque cualquier

  clavo sobresaliente en la madera o córtelo nivelados con la
  madera

Siempre lleve gafas de seguridad

aprobadas por OSHA durante la

construcción.

Содержание 16616

Страница 1: ...7 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ANTES DE DEVOLVERLO LL MENOS Si desea m s informaci n sobre el montaje ll menos sin coste adicional algun...

Страница 2: ...This page intentionally left blank Esta p gina est intencionado en blanco...

Страница 3: ...Techo a dos aguas 8 First Check with your local building authority before erecting Read instructions thoroughly before you begin Building Codes Our buildings are designed to meet most local and natio...

Страница 4: ...244 cm 3 4 x3 1 2 x55 1 9x8 9x140 cm 1 x 4 x 5 9 16 14 cm HP x2 3 4 1 9 cm x7 FERRETER A HARDWARE x1 3 7 6 cm 2 5 0 cm 1 1 4 3 2 cm 1 2 5 cm x 385 x 16 x 92 x 26 Actual Size Dimensiones verdaderas x1...

Страница 5: ...ALES ANTES DE EMPEZAR A MONTAR SU EDIFICIO Wood is a natural product that has inherent blemishes All interior framing is graded for structural strength and not appearance Exterior trim is graded for o...

Страница 6: ...beginning assembly of building B Base en losa de concreto Treated Sill Soleras Inferiors Tratadas PREPARACI N DEL SITIO El sitio debe de estar nivelado correctamente Instale una barrera contra yerbaj...

Страница 7: ...L MURO POSTERIOR MURO POSTERIOR 1 1 4 3 2 cm Flush Nivelado Flush Nivelado OY F x 1 2 5 cm PQ x2 2 5 cm Nail clavo Fasten Temporarily Left Panel F only Fijaci n al panel izquierdo F solamente Back sid...

Страница 8: ...6 x17 BACK WALL BACK WALL x 17 2 5 cm MURO POSTERIOR MURO POSTERIOR 1 2 5 cm 8 20 cm 3 4 1 9 cm G 47 1 2 121 cm Edge Borde 2 5 cm...

Страница 9: ...5 cm 1 2 5 cm 1 2 5 cm 3 2 Nails clavos 5 cm 3 2 Nails clavos 5 cm Flush Nivelado Flush Nivelado LN x2 Flush Nivelado Flush Nivelado Flush Nivelado OY D x3 1 1 4 3 2 cm Fasten Temporarily Left Panel...

Страница 10: ...x 4 FRONT WALL MURO DELANTERO MURO DELANTERO 2 5 cm LN 5 12 7 cm E Flush Nivelado 3 4 1 9cm OC Temporary Support apoyo no permanente x 2 3 7 6 cm PN 45 1 4 115 cm 2 1 2 6 3 cm OR 3 1 2 9 cm Flush 2 1...

Страница 11: ...1 2 5 cm Flush Nivelado Flush Nivelado 3 2 Nails clavos 5 cm 3 2 Nails clavos 5 cm OC Temporary Support apoyo no permanente x 10 2 5 cm 96 244 cm 5 12 7 cm D OC Temporary Support apoyo no permanente...

Страница 12: ...pared y refu rzala No hinque los clavos completamente Level Wall and Brace Do not sink nails completely 2 5 cm 12 30 cm 96 244 cm 3 7 6 cm 2 5 cm 3 7 6 cm 3 7 6 cm 3 7 6 cm 2 5 cm Flush Nivelado Nail...

Страница 13: ...5 cm nail clavo 2 5 cm nail clavo 2 5 cm nail clavo OY Nail into OY Clavo en OY centre la asamblea de la pared sobre el piso Center Wall Assembly on Floor OY Temporary Support apoyo no permanente x 40...

Страница 14: ...poyo no permanente despu s de la instalaci n del lado muro REMOVE QUITE Remove Temporary Corner Trim Quite no permanente moldura Remove Temporary Corner Trim Quite no permanente moldura Remove Brace Q...

Страница 15: ...Right Derecha x2 R IS 5 9 16 14 cm 5 9 16 14 cm Center centro Flush Nivelado Flush Nivelado Flush Nivelado Center centro IS R Glue Pegamento Glue Pegamento 1 1 4 3 2 cm x32 TRIM MOLDURA Flush to top o...

Страница 16: ...14 x 40 x 40 x 40 x 40 TRIM MOLDURA 1 1 4 3 2 cm x8 x4 1 1 4 3 2 cm Flush Nivelado x4 1 1 4 3 2 cm x32 TRIM MOLDURA OY OY OY Straight Edge borde recto Stagger Screws escalonar tornillo...

Страница 17: ...15 x 40 x 40 3 7 6 cm x12 x 40 x 40 2 5 cm x60 3 7 6 cm 102 259 cm Flush Nivelado TY x2 N N Glue Pegamento ROOF TECHO ROOF TECHO x3...

Страница 18: ...16 TRIM x 40 MOLDURA x20 2 5 cm x 40 x20 2 5 cm HP HP Flush Nivaledo AK AK HP TRIM MOLDURA...

Страница 19: ...one nail in each lower corner Continue nailing as instructed Racking a Wall Alineando un Muro Al construir los muros aplique siempre el panel al frente del edificio Posicione el panel nivelado con la...

Страница 20: ...18 x 40 x58 2 5 cm x 40 x58 2 5 cm 1 3 4 2 3 4 1 9 cm C C 1 8 3 2 cm 1 8 3 2 cm SIDE WALL MURO DELANTERO SIDE WALL MURO DELANTERO 1 3 4 2 C...

Страница 21: ...icione los paneles nivelados con el borde delantero exterior de la viga y clave en las dos esquinas como en el dibujo Alinee escuadra el panel por mover los extremos opuestos arriba o abajo hasta que...

Страница 22: ...20 x 40 x70 2 5 cm 12 30 cm ROOF TECHO H x2 J x2 x 40 x8 1 1 4 3 2 cm DOOR PUERTA M L 3 8 9 cm 3 8 9 cm 3 8 9 cm 3 8 9 cm Parte Super ior Top P P...

Страница 23: ...open properly Quite despu s de fijar la puerta con tornillos compruebe que las puertas abren bien Bottom of door trim flush with bottom of wall panel Nivelado de la pared panel fondo con el fondo del...

Страница 24: ...22 x 40 DOOR PUERTA x18 1 5 cm Center Centro Install 1 screw from inside instale 1 tornillo desde dentro GI...

Страница 25: ...UERTA 1 2 5cm 1 2 5cm Flush Nivelado 2 5cm Inside of Door Interior de la Porte Drill 3 8 9cm Hole Flush Nivelado 6 1 2 5 cm Screws tornillos 5 3 7 6 cm Screws tornillos 5 3 7 6 cm Screws tornillos 3 4...

Страница 26: ...y d blela sobre el otro lado del techo Side that hangs over side No Nails La parte que est colgada sobre un lado No clavar Caulk Masillado Close up of dripedge Vista del gotero GOTERO DE BORDE No Inc...

Страница 27: ...el borde del techo para escalonar las tejas Flush to edge stagger each row Nivele al borde escalone cada fila Maintain same deminsion across Mantenga la misma dimensi n de un lado al otro Remove over...

Страница 28: ...para clavos sobresalientes hinque clavos sobresalientes en la madera or c rtelos nivelados con la madera Keep grass trimmed and away from building Corte y quite la hierba cerca del edificio Keep Spri...

Страница 29: ...27 Notas Notes...

Страница 30: ...vertura y el entablado est n garantizados por dos a os 5 La covertura SmartSide est garantizada por 10 a os para los edificios Marco Series y por 15 a os para los edificios Premier Series 6 La covertu...

Страница 31: ...29...

Страница 32: ...30...

Отзывы: