-11-
PRE-OPERATION
(Continued)
Slide pump on receiver and secure with pin (E) provided and install safety-locking device.
Slide spring loaded locking collar (F) on PTO yoke rearward, and slide yoke onto the tractor PTO shaft.
Release spring loaded collar. Be sure the pins fall into the grove of the tractor PTO shaft and collar
snaps forward into position. CAUTION: Do not use steel hammer to aid in joining PTO parts.
Remove weight from lift jack and place in storage position (G).
Connect four hydraulic hoses to the tractor (9’ pickups). Two hoses open and close the machine and the
other two supply oil to the electric/hydraulic solenoid valve for pickup heads.
Connect six hydraulic hoses to the tractor (12’ pickups). Two hoses open and close the machine, two
hoses raise and lower the left hand head and two hoses raise and lower the right hand head.
4.
5.
6.
7.
8.
F
E
G
Содержание TWIN MERGER
Страница 6: ...4...
Страница 9: ...7...
Страница 11: ...9...
Страница 21: ...DECAL LOCATION Continued 19 K H R S H I A L S B I J C I M P G C N F D E Q P O...
Страница 24: ...22...
Страница 26: ...FIGURE 2 24...
Страница 28: ...FIGURE 3 26...
Страница 30: ...FIGURE 4 28...
Страница 32: ...FIGURE 5 30...
Страница 34: ...FIGURE 6 32...
Страница 36: ...FIGURE 7 34...
Страница 38: ...FIGURE 8 36...
Страница 40: ...FIGURE 9 38...
Страница 42: ...FIGURE 10 40 PUMP SEE FIGURE 18...
Страница 48: ...FIGURE 15 46...
Страница 50: ...FIGURE 16 48...
Страница 56: ...FIGURE 21 54...
Страница 59: ...SERVICE MAINTENANCE RECORD DATE DESCRIPTION NOTES 57...
Страница 60: ...SERVICE PARTS NOTES...
Страница 62: ...H S MFG CO products approved for the FEMA SEAL OF QUALITY...