-18-
•
There is a 3/8″ shim that is included in the wiring/control
box. Insert the 3/8″ shim from the
BOTTOM
of the locking
bracket on the suspension linkage between the split -
(B).
NOTE: The split will open after the heads have been
lowered to the ground.
• With the shim in place, tighten all (8) head bolts back up
checking to make sure the 3/8″ gap is maintained as the
bolts are tightened.
• Remove the shim and repeat the process on the other
head.
SET-UP & ASSEMBLY
IMPORTANT! HEAD SET-UP FROM SHIPPING
* Connect the tractor to the merger using the instructions from the Machine Prep & Operation Chapter
in this Manual.
•
Loosen the (4) head bolts (A) with 3/4″ wrenches on both sides of the locking brackets -
total of (8)
on each head.
NOTE: Access to the head nuts is gained through the opening on the back of
each head (C) as shown in the bottom picture.
• Connect the hydraulics lines to the tractor.
• Using the tractor hydraulics, lower the heads to the ground.
(B)
(A)
(A)
(C)
Содержание TF6128
Страница 6: ... 4 Intentionally Left Blank ...
Страница 8: ... 6 Intentionally Left Blank ...
Страница 10: ... 8 Intentionally Left Blank ...
Страница 13: ... 11 SAFETY INFORMATION ...
Страница 14: ... 12 SAFETY INFORMATION ...
Страница 17: ... 15 HYDRAULIC FITTING TORQUE SPECIFICATIONS ...
Страница 18: ... 16 HYDRAULIC FITTING TORQUE SPECIFICATIONS ...
Страница 19: ... 17 HYDRAULIC FITTING TORQUE SPECIFICATIONS ...
Страница 42: ... 40 DECAL LOCATION 5896B 82602 9194A 82602 5896B 83775 83773 83774 83775 1494L ...
Страница 43: ... 41 DECAL LOCATION 1906C 1906C 1906C DCAMB 11599 1906C 31401 73101 12502A 093020 ...
Страница 44: ... 42 DECAL LOCATION 11599 12502A 73101 31401 1906C DCAMB 1906C 093020 1906C 1906C 1906C ...
Страница 46: ... 44 DECAL LOCATION DC32211B DC32211B 11599 093020 11599 DC32311B 1906C 1906C ...
Страница 48: ... 46 DECAL LOCATION DC32211A 093020 093020 DCRED DCRED ...
Страница 49: ... 47 SERVICE NOTES ...
Страница 50: ...SERVICE NOTES ...
Страница 51: ......