
-14-
1. Assemble the Rake or check the Rake for proper assembly and adjustment. Make sure that all
bolts are tightened.
2. Attach the wheels with tires if they are not attached using the lug nuts furnished, and torque the
mounting hardware to 85-95 ft./lbs. of torque. Check wheel bolts periodically thereafter.
3.
Check tires and inflate to the recommended pressure for field use (205/75D15 - 25-30 PSI).
4. Lubricate the rake completely. (See Lubrication Chapter in this Manual.)
5. Rake tooth bolts must be torqued to 40 ft./lbs. to help prevent excessive tooth breakage. See the set-
up instructions for mounting procedure.
NOTE:
Re-torque rake tooth bolts after the first 100 acres. Chec
k periodically thereafter.
NOTE:
Determine right or left side of the Rake by viewing it from the rear. If instructions or parts
lists call for hardened bolts, refer to the Cap Screw Torque Values page to identify.
SET-UP & ASSEMBLY
Содержание 3210
Страница 6: ...4 Intentionally Left Blank...
Страница 8: ...6 Intentionally Left Blank...
Страница 10: ...8 Intentionally Left Blank...
Страница 13: ...11 SAFETY INFORMATION...
Страница 26: ...24 DECAL LOCATION 11599 2700A DCRED DCRED 2700A 093020 093020 093020 DCAMB 82907L...
Страница 29: ...27 SERVICE NOTES...
Страница 30: ...28 SERVICE NOTES...
Страница 31: ......