9
PDI (Setup)
-
9
.2
-
4)
Cut the ties holding the hydraulic cylinder
and hoses to the Bale Processor body. Allow
it to swing freely.
5)
Rotate the Deflector Shield and the
Hydraulic Cylinder until the mounting
holes align.
6)
Install the Cylinder Mounting Pin removed
in step 2. Secure in place using the 3/8”
bolt, flat washer, and Nyloc nut removed in
step 1.
Содержание 2957
Страница 4: ...1 3...
Страница 5: ...1 4...
Страница 6: ...1 5 Page Intentionally left Blank...
Страница 14: ...3 2 3 Safety Decal Locations...
Страница 15: ...3 3 3 Safety Decal Locations...
Страница 17: ...3 5 3 2 Information Decal Locations...
Страница 35: ...5 5 5 4 PTO...
Страница 42: ...7 3 Bolt Torque 7 2...
Страница 43: ...7 3 7 4 Overall Dimensions...
Страница 48: ...Notes 10 1...
Страница 49: ......
Страница 50: ...H S MFG CO Products approved for the FEMA SEAL OF QUALITY...