GB
93
TILE
Top stone
H26T High/H26K High
Damper
The top grate damper is regulated using the control on
the top. When the damper is open, the heated air flows
into the room and spreads the heat. When the damper
is closed, a greater amount of heat is stored in the
soapstone, which releases the heat more slowly and over a
longer period.
Apply a few small drops
of silicone beneath the
tile top to hold it in place.
Final assembly instructions
Carefully place the grate so that it
rests on the pins or the cast edge
of the tile top.
Check that the damper can be
opened and closed properly.
Position adjusting screws on the top of the back
plate and screw them down so that the screw heads
are level with the upper side stones. Slacken the
uppermost screws on the corner profiles. Position the
screen so that it is resting on the corner profiles and
then tighten the screws to secure the screen in place.
Then mount the convection box on the screen.
Screw the convection box securely into the upper
front profiles.
Position the top stones on top of
the stove. Pins are placed in the
soapstone top for the grate to
rest on.
Then connect the aluminium
hoses to the convection box.
Содержание H26T/K Tall
Страница 1: ...INSTRUCTIONS 26T 26K Installation...