GB
81
When installing the chimney, please refer to the chimney
installation instructions. The chimney is connected to the stove
as described below.
The insert comes from the factory ready for top connection. When
connecting from the rear, the cover and connection must be swapped
around.
Top connection to the chimney
If connecting from the top, the whole stove surround must be installed
before installation of the chimney can begin.
The start pipe is placed over the connection on the insert. Make sure
that the gasket on the connection is intact and in position. The stop
washer is positioned over the collar on the start pipe. Install the
remaining parts according to the instructions for the chimney.
Chimney connection
Important! If connecting from the top, the hot air
grate must be installed before the chimney.
!
Chimney mantle
Stop washer
Start pipe
Rear connection to a masonry
chimney
Mark out the centre for making a hole in the wall to the flue.
Check that the connection height in the chimney breast is
the same as the height of the connection pipe from the stove.
Make a hole with a diameter of
approx. 180 mm.
Then cement the wall connector
with fireproof mortar (not
supplied with the product).
Let the mortar dry before the
stove is connected to the chimney.
Move the stove back into place.
Make sure that the connector
gasket does not work loose from
its position. If further sealing
material is required, heat-
resistant sealant may be used.
Slide the connection pipe into
the wall connector and seal the
joint with sealing rope.
Use a hammer to tap out the
knockout in the back plate.
Hang the back plate into place
on the side profiles as explained
later in these instructions.
Содержание H26T/K Tall
Страница 1: ...INSTRUCTIONS 26T 26K Installation...