GB
87
3 mm
419 mm
Install the 4 screws in the upper front stone. Leave 3 mm
between the stone and the screw flanges.
Hang the front stone in the key holes.
Install the adjustment angle pieces on the upper
concrete screws. Adjust the stone so that it is line with
the side stones at the upper edge. Tighten the 4 concrete
screws
IMPORTANT!
Check that the distance between the door
and upper front stone is 4 mm. If necessary, the insert
feet can be adjusted to achieve an even gap between
both front stones and the door.
Install the mounting plate at the top edge on the lower front
stone. Position the front stone and secure it using 2 x M5
screws in the body.
11
12
13
14
Mount the upper rib piece on the silicone cones, the screws
must be pointing downwards. Then position the top stone,
grate and cover.
See page 94 for installing the heat tank.
Important
If the fan is to be installed, this must be performed
before installing the lower front stone.