AI-007 operation manual
Issue 1 12.10.10, HMI version 13, plc version 29
P.16 of 43
> Preparation for Installation
Installation must be carried out by authorized personnel. Follow the steps below:
1.
Position the machine on a flat surface and allow at least 50cm clearance on both sides as well as
the back side, this is essential for the hot air deflector to work properly and also to allow enough
room for carrying out necessary service and maintenance
2.
Adjust the foot stand so that the machine is level and stable.
3.
Cut loose all packing cable ties and materials in order to free up all machine movements.
4.
Connect the power plug to a suitable outlet with at lease 15A capacity.
5.
Locate the air hose supplied with the machine. Connect one end to the inlet of the water filter at
the back side of the machine; connect the other end to a compressed air supply such as air
compressor or central air supply. Make sure the compressed air supply has at least 0.6 Mpa (6 bar)
of pressure and a flow rate of no less than 100L/min.
6.
Install the tape dispenser assembly at the top of the machine and align the tape spool at right
angle to the width of the machine. (see diagram below)
7.
Install a roll of seam tape with the adhesive side facing the operator (refer to the section on tape
loading).
8.
The machine is now ready for operation.
Install tape dispenser assembly
Содержание AI-007
Страница 6: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 5 of 43 Name Plate...
Страница 42: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 41 of 43 Appendix B Electrical Scheme...
Страница 43: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 42 of 43 Appendix C Wiring Scheme...
Страница 44: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 43 of 43 Appendix D Pneumatic Scheme...