AI-007 operation manual
Issue 1 12.10.10, HMI version 13, plc version 29
P.21 of 43
> Start Up and Shut Down Procedures
Both start up and shut down procedures are extremely important to the well being of AI-007, please
take steps to follow the procedures described.
Location of power ON/OFF switch
Location of main air supply ON/OFF switch
Location of heater ON/OFF button
1
power OFF button
2
power ON button
3
main air ON/OFF switch
4
heater ON/OFF button
1
2
3
4
Содержание AI-007
Страница 6: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 5 of 43 Name Plate...
Страница 42: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 41 of 43 Appendix B Electrical Scheme...
Страница 43: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 42 of 43 Appendix C Wiring Scheme...
Страница 44: ...AI 007 operation manual Issue 1 12 10 10 HMI version 13 plc version 29 P 43 of 43 Appendix D Pneumatic Scheme...