HAMWORTHY HEATING LTD
16
WEYMOUTH
500001112/C
10.5 Pressure Switches On Both Units (
part n° 533925005)
Figure 26 Capillary Nut
1) Undo the capillary nut holding the end into the pipe (see fig 26).
2)
Take off the wires. The cold fill pressure switch on both units is
connected to two orange wires which can be reconnected any way
round. The Hi and Lo pressure switches (Advanced only) must be
reconnected as shown in fig 27.
3)
Pressure switch must be set to correct level. Setting instructions are
given in section 7.
Figure 27 Switch Wiring
(Advanced Only)
10.6 Pressure Gauge On Both Units. (
part n° 537002009)
1) Undo the capillary nut holding the end into the pipe (see fig 26).
2) Depress the tags on the opposite sides of the gauge body and push through the panel (see fig 28)
Figure 28 Pressure Gauge