HAMWORTHY HEATING LTD
7
WEYMOUTH
500001112/C
6.3 Electrical connection.
Wiring diagrams for the Standard and Advanced units can be found fixed inside the cover of the unit and in the
appendix. All wiring to the pressurisation unit must be in accordance with the IEE regulations, and any local
regulations which apply.
Note!
If in any doubt a qualified electrician should be consulted.
6.3.1 Mains Connection
Both the Standard and Advanced are supplied fitted with a 1m flying lead for connection to the mains supply.
Mains connection must be via a fused isolator rated at 13 Amps and positioned locally to the unit.
6.3.2 Safety Switches/Circuits On Advanced Only
The SPDT hi and lo pressure switches can be incorporated into circuits to interrupt a boiler control signal, in
order to shut down the boiler in the event of a system fault condition. The boiler control system must be designed
so that manual resetting is required after a system fault condition.
The circuits are rated at 230 V ~50 Hz, 15A. NOTE if the factory set pressure switch levels are to be altered
terminal should not be connected at this stage.
The connection terminal and its location is shown in fig 10.
Figure 10 Advanced Alarm Terminal
Figure 9 - Pipework Connections
STANDARD
ADVANCED
Содержание Weymouth Advanced
Страница 25: ...HAMWORTHY HEATING LTD 19 WEYMOUTH 500001112 C Figure A1 Wiring Diagrams...
Страница 27: ...Notes...