HAMWORTHY HEATING LTD
Page
UPTON FLOOR STANDING SERIES
500001340/C
2
ii
CONTENTS
PAGE
1.0
INTRODUCTION
................................................................................................................................
1
2.0
SUPPLY AND DELIVERY
..................................................................................................................
3
3.0
SIZE AND SPACE REQUIREMENTS
...............................................................................................
5
4.0
SITE LOCATION AND PREPARATION
..........................................................................................
13
4.1
Site Location
4.2
Gas Supply
4.3
Flue System
4.4
Water Supply
-
including heat exchanger warranty conditions
4.5
Condensate Connections
4.6
Electrical Supply
5.0
BOILER ASSEMBLY
.......................................................................................................................
18
5.1
General
5.2
Water Connections
5.3
Flue Connections
5.4
Sealed Systems
5.5
Electrical Connections
6.0
PRE
-
COMMISSIONING
...................................................................................................................
19
6.1
Gas Supply
6.2
Ventilation
6.3
Pipework, Valves and Pump
6.4
Flue
6.5
Electrical
7.0
CHECKS PRIOR TO LIGHTING
......................................................................................................
21
7.1
Boiler Gas System Leak Check
7.2
Checks Prior to Lighting the Boiler
7.3
Commissioning the Boiler
8.0
INITIAL LlGHTING
...........................................................................................................................
22
8.1
Operational Checks
8.2
Controls Operation
8.3
Ignition Controller Check
8.4
Gas Pressure Check
8.5
Combustion Checks
8.6
User Instructions
9.0
FAULT FINDING
..............................................................................................................................
28
9.1
Safety Temperature Limiter (Limit Thermostat)
9.2
Ignition Controller
9.3
Water Flow Switch
10.0
SERVICING
......................................................................................................................................
30
11.0
REPLACEMENT OF FAILED COMPONENTS
...............................................................................
32
12.0
RECOMMENDED SPARES
.............................................................................................................
34
Содержание UF150-1
Страница 35: ...HAMWORTHY HEATING LTD 29 UPTON FLOOR STANDING SERIES 500001340 C Figure 9 3 1 Wiring Diagram...
Страница 63: ......