Hamworthy Sherborne Series Скачать руководство пользователя страница 41

 

HAMWORTHY HEATING LTD 

 

39 

SHERBORNE 

 

500001167/E 

 

C1.2 Waste Gas Volume & Temperature.

 

 Where the boiler(s) discharge into a chimney system, it is recommended that the volume & temperature of the 
waste gases used for design of the flue system are as detailed in the Flue Data table. 

 
C1.3 Suction 
 

The flue system must be designed acknowledging that there is a positive pressure generated by the combustion fan. It is 

recommended that a draught stabiliser is fitted to the flue system where the draught is likely to become –ve at the 
boiler connection. 
 

C1.4 Maximum Length of Flue Duct 
 

For single boiler installations, the maximum allowable linear 

equivalent length of straight ducts for both twin duct & concentric 
systems is 10m & 7m respectively. This dimension relates to the 
distance between the boiler & the discharge terminal. Figure 
C1.1 details the equivalent length of flue tube. Components can 
be combined in any order provided that the total equivalent 
length of flue does not exceed the maximum. 

Note: 

if the 

maximum stated length is exceeded, the boiler will not achieve 
maximum output. 

 
 
 
 
C1.5 Disconnection 

 Each boiler is fitted with a telescopic appliance connector, enabling the boiler to be disconnected from the flue 
system.  
 

WARNING:  THE FLUE SYSTEM MUST BE SELF SUPPORTING & NOT PRESENT  

A RISK TO PEOPLE IN OR AROUND THE BUILDING.

 

 

C1.6 Flue Discharge 

 The flue system must ensure safe & efficient operation of the boiler to which it is attached, protect the combustion 
process from wind effects & disperse the products of combustion to the external air. The flue must terminate in a 
freely exposed position situated to prevent the products of combustion entering any opening in a building. Where 
the application requires the flue discharge to terminate below 2m above ground level, the use of a terminal guard 
is required. 
 

C1.7 Surface Temperatures 

 Combustible materials in the vicinity of the boiler & flue shall not exceed 65°C during boiler operation. The flue 
shall not be closer than 50mm to any combustible material, except where it passes through such material with a 
non-combustible sleeve when the air gap may not be less than 25mm. 
 

C1.8 Location 

 The flue system must not be placed or fitted where there is undue risk of accidental damage to the flue pipe or 
undue danger to persons in the vicinity. Check that the flue & chimney are clear from any obstruction. Sherborne 
boilers are suitable for installation in a balanced compartment in accordance with the requirements of BS 6644. 
Consult Hamworthy Heating Technical Department for help or assistance if in doubt. 
 

C1.9 Condensate Discharge 

 Due to the high thermal efficiency of the boiler, condensation will occur within the boiler casing during firing from 
cold conditions. A drain with an integral trap is fitted to the rear of each module suitable for connection to a 32mm 
plastic waste pipe (not Hamworthy Heating Ltd supply), which must be connected to a tundish (not Hamworthy 
Heating Ltd supply). Discharge piping from a tundish should be of synthetic material due to the mild acidity of the 
condensate (pH3-5), with all discharge piping having a minimum fall of 30mm/m away from the boiler. 
Consideration should be given to possible freezing of condense water traps & pipework. This must be avoided at 
all times by routing pipework within the building, where possible 
 
 

Flue Resistance 

Equivalent tube lengths. 

Component 

Length m 

Straight tube ø100mm per m  

45° bend ø100mm 

2.25 

Concentric 90° bend Ø100/150mm 

2.20 

90° bend ø100mm 

4.10 

Concentric straight tube Ø80/125mm /m  

Concentric straight tube Ø100/150mm /m  

Concentric 45° bend Ø100/150mm 

1.30 

Содержание Sherborne Series

Страница 1: ...OPERATING OR SERVICING EQUIPMENT Sherborne Series Boilers Room Sealed Fully Modulating Pre Mix Gas Fired Boilers for Heating Domestic Hot Water Installations Installation Commissioning and Servicing...

Страница 2: ......

Страница 3: ...E ENSURE RELEVANT INFORMATION REQUIRED WITHIN DOCUMENT IS FOUND RELATING TO SPECIFIC GAS TO BE FIRED BEFORE FIRING BOILER THIS BOILER COMPLIES WITH ALL RELEVANT EUROPEAN DIRECTIVES EC TYPE CERTIFICATE...

Страница 4: ...d Systems 5 8 7 Sealed Systems 5 9 Electrical Connections 6 0 PRE COMMISIONING 15 6 1 Gas Supply 6 2 Ventilation 6 3 Pipework valves pump 6 4 Flue 6 5 Electrical 7 0 BOILER CHECKS 16 7 1 Boiler Gas Sy...

Страница 5: ...APPENDIX B ELECTRICAL CONNECTIONS CONTROLS 36 APPENDIX C FLUE DATA 38 C1 1 General Requirements C1 2 Waste Gas Volume Temperature C1 3 Materials C1 4 Suction C1 5 Disconnection C1 6 Flue Discharge C1...

Страница 6: ...e satisfied including interlocks which will shut the boiler s off should a high or low pressure fault occur Pressurisation units must also incorporate a low level water switch which protects the water...

Страница 7: ...separately from the boilers Ancillary items such as isolation valves flexible boiler connectors are packaged in a cardboard box on the same pallet The dimensions of these packages are shown below Deli...

Страница 8: ...Hole Gas 3 4 Electric M20 Electric M20 Cover removal clearance 30 Return 50 Flow 200 Flue 76 Flow 140 Flue 154 Return 185 460 280 600 A B 800 Water connections 85 200 320 Boiler Model Return connecti...

Страница 9: ...terials Also important is allowance for sufficient access at front sides top bottom of boiler for flue pipework connections A minimum space of 450mm in front of the boiler is required for removal of t...

Страница 10: ...HAMWORTHY HEATING LTD 8 SHERBORNE 500001167 E 4 Boiler Layout Description 4 1 Accessory Pack...

Страница 11: ...1 IGE UP 1A Gas installation must be purged to BS 6891 or IGE UP 1 IGE UP 1A Inlet gas pressure to boiler for Natural Gas should be nominal 20mbar minimum 17 5mbar dynamic at the connection to the bo...

Страница 12: ...suction is greater than 30Pa refer to HHL Technical This condition must then be checked hot and with all boilers firing the max pressure at the connection to the boiler should be 100Pa positive In th...

Страница 13: ...ECTIONS APPENDIX B 5 7 Mounting the boiler to the wall Select a position on the wall or the position the free standing frame with the minimum clearances from section 4 Position the template on the wal...

Страница 14: ...plate over the flue securing it to the wall Fit the flue support cradle over the end of the flue pipe Fit the flue concentric adaptor to the rear of the flue protruding into the boiler Ensure orienta...

Страница 15: ...lf supporting using wall brackets where necessary In terminating the flue ensure that the joint through the wall roof is made good weatherproofed Whilst carrying out the above procedure ensure that al...

Страница 16: ...end the use of the connection for the safety valve as detailed in Figure 3 2 Where HHL pipework kits are used their assembly instruction manual is supplied with the kit 5 9 Electrical Connections The...

Страница 17: ...to Hamworthy Heating recommendations Circulating system is full of water vented pressurised appropriately Circulation pump is fitted working interlocked where required Pipework connections to boiler a...

Страница 18: ...or normal operation The following checks must be made prior to lighting the boiler Check gas supply is connected but turned to off position Check unions fittings are correctly tightened test points cl...

Страница 19: ...h On the isolating valve Wait at least 15 seconds before pressing re set button on fascia to re set controller After a waiting period the boiler will light run normally 7 3 3 Flame Signal Assessment T...

Страница 20: ...ase the CO2 level turn the adjustment clockwise CO 0 50ppm However the figure must not exceed 200ppm under normal operating conditions If combustion readings fall within the required range the boiler...

Страница 21: ...safe reliable operation all wiring between sensors master slave boilers must be separated from mains voltage wiring 8 1 Fascia Details 8 2 Display Details In it s standard version the screen displays...

Страница 22: ...ss the information button to switch back to the information display or the mode button to return to the default display After 8 minutes the display will automatically change back to the default displa...

Страница 23: ...of the display 8 5 1 Internal Error Code Display If the fault cannot be rectified then extra information can be obtained from the internal error code To obtain this code press the into button then pr...

Страница 24: ...thermostat Investigate cause of overheating see section 9 3 113 Flue gas supervision equipment has cut out 117 Water pressure too high 118 Water pressure too low 119 Water pressure switch has cut out...

Страница 25: ...rameter to be set To leave the programming mode without changing the current parameter press the information button If no button is pressed for 8 minutes the screen will return to the default display...

Страница 26: ...y set Refer to section 8 3 2 for an explanation of how to set this Each time the or button is pressed during the time setting the seconds are set to 0 The clock continues to run while making the setti...

Страница 27: ...HAMWORTHY HEATING LTD 25 SHERBORNE 500001167 E...

Страница 28: ...ntrol Panel Assembly The control system is contained within the control panel pod on the side of the boiler The front panel can be re moved by removing the two screws at either side of the panel The f...

Страница 29: ...HAMWORTHY HEATING LTD 27 SHERBORNE 500001167 E 8 9 Wiring Diagram...

Страница 30: ...HAMWORTHY HEATING LTD 28 SHERBORNE 500001167 E 8 10 Wiring Diagram LMU...

Страница 31: ...to cool to normal operating temperature If after pushing the reset pushbutton resetting the lockout the code on the display does not extinguish the boiler does not fire up it is possible that the lim...

Страница 32: ...venturi tube with a soft brush if necessary Remove the 2 nuts securing the burner to the heat exchanger carefully remove the burner assembly Remove the single socket cap head screws securing the igni...

Страница 33: ...ly recommended that a minimum of two people are on hand to lift the module from the wall Alternatively two lifting eyes are provided for use with suitable lifting equipment Place the module on two blo...

Страница 34: ...ing the thermostat to the display panel withdraw the capillary bulb from the sensing pocket in the front of the heat exchanger Check the operation of the device by carefully applying a heat source to...

Страница 35: ...plugs are firmly correctly located Re light the boiler check adjust the combustion as detailed in Section 7 11 6 Main control PCB Part No 533901508 SE64he Nat Gas Part No 533901xzy SE71c Nat Gas Part...

Страница 36: ...PG 533901511 Fascia PCB 533901437 Fan assembly 533901376 Flow return Sensor 533901431 Flame sensing probe 533805019 Hot Surface Igniter 563801011 Temperature Limiter 533901179 Pressure Switch 53390149...

Страница 37: ...ximum Gas Inlet Pressure mbar 25 Minimum Gas Inlet Pressure mbar 12 5 Gas Flow Rate maximum m3 h Target CO2 at High Low fire 0 25 8 7 7 4 GENERAL DATA BOILER MODEL Model Sherborne SE64he Sherborne SE7...

Страница 38: ...n of the single boiler battery with a separation of at least 3mm in all poles 3 A mains isolator must be provided adjacent to the boiler in a readily accessible position The supply should only serve t...

Страница 39: ...HAMWORTHY HEATING LTD 37 SHERBORNE 500001167 E External Control Wiring for Multiple Module Installation...

Страница 40: ...high thermal efficiency of the boiler condensation in the flue will occur It is strongly recommended that twin wall or insulated flue pipe is used on all installations b Care should be taken to ensure...

Страница 41: ...lication requires the flue discharge to terminate below 2m above ground level the use of a terminal guard is required C1 7 Surface Temperatures Combustible materials in the vicinity of the boiler flue...

Страница 42: ...stable 100 150 x 1m long 029 030 Ref Concentric Flue Ref Concentric Flue Ref Horizontal terminal Assembly 100 150 031 Eccentric Adaptor Enlarged detail showing cut 80 100 80 Flue Support Bend 023 Ref...

Страница 43: ...Eccentric Adaptor Flue type C33 150 x 100 80 100 80 Flue Support Bend Ref 020 Ref 043 023 Ref Ref 001 Ref 029 Ref 030 Ref 033 027 Ref 028 Ref 038 Ref 044 Ref Ref 032 Flat Roof Flashing Adjustable Flas...

Страница 44: ...t 0 4m min 10m max Ref 023 Ref 001 80 Flue Support Bend Outlet 0 4m min 10m max 80 100 Outlet 10m max Inlet 1 0m max Single Flue Single Flue Single Flue 250 long 100 1000 long 100 500 long 100 Wall Cl...

Страница 45: ...ng 100 Single Flue Ref 026 Vertical terminal 100 Flue Ref 023 80 100 Eccentric Adaptor Ref 017 Wall Clamp 100 Ref 022 021 Ref 020 Ref Single Flue 500 long 100 1000 long 100 Single Flue Single Flue 250...

Страница 46: ...d in a boiler room or internal space the room or internal space must have permanent air vents directly to the outside air at high level at low level with the general requirements detailed above on loc...

Страница 47: ...mpartment ventilation is used Where grilles communicate directly with outside air they shall be positioned on the same wall Mechanical Ventilation Flow Rates Flow rate per kW total rated heat input Ne...

Страница 48: ...o ensure equal flow in each module or with a single pipe header system Figure E1 1 1 on the following page show typical layouts Ideally individual valves should be fitted to each module to enable isol...

Страница 49: ...tic Valve valve Drain Valve Module Hamworthy Modular Boilers Safety T valve Module 1 2 Drain 3 Module P gauges Pressure Temperature T Automatic Ai r Vent Heating lo ad Lockshield va lve fill line Temp...

Страница 50: ...w circuits during periods of low heat demand E1 10 Waterside Pressure Drop The waterside hydraulic resistance Pressure drop is given in table at beginning of Appendix E E1 11 Water Flow Controls Any e...

Страница 51: ...E 500001167 E Schematic for Single Boiler System Schematic for Single Boiler Primary Circuit System Schematic for Multiple Boiler External 0 10V Primary Circuit System Schematic for Multiple Boiler HH...

Страница 52: ...HAMWORTHY HEATING LTD 50 SHERBORNE 500001167 E INSTALLER SITE ADDRESS BOILER TYPE BOILER SIZE S UNIT NO S SERIAL NO S FLUE USEFUL USER INFORMATION NOTES...

Страница 53: ......

Страница 54: ......

Отзывы: