5.0 SITE LOCATION & PREPARATION
5.1 Site Location.
•
The wall, floor or plinth for the boilers, frames & water manifold kit must be both flat & level to ensure correct
alignment of fittings & connections.
•
The wall or floor must be sufficiently strong to support the weight of both the boilers & manifold kit where used.
•
The wall or floor must be fireproof in accordance with BS 6644.
•
The plantroom must have sufficient space for installation of boilers, manifold kits, pipework, pumps, controls, flues,
ventilation, access & servicing, & other items of plant.
5.2 Gas Supply.
•
Gas supply pipes must be in accordance with BS 6891 or IGE/UP/2
•
Gas supply connection to the boiler must not be smaller than the connection on the boiler - Rp 3/4”
•
Gas installation must be soundness tested to BS 6891 or IGE/UP/1 & IGE/UP/1A.
•
Gas installation must be purged to BS 6891 or IGE/UP/1 & IGE/UP/1A.
•
Inlet gas pressure to boiler for Natural Gas should be nominal 20mbar (minimum 17.5mbar) dynamic at the
connection to the boiler. Refer to Appendix A for LPG.
•
Boiler house gas isolation valve must be clearly identified & installed close to the entrance / exit.
5.3 Water Supply & Return
•
Feed & Expansion tanks to comply with static height requirements of BS6880 & BS6644.
•
Cold feed & open vent pipes to comply with requirements of BS 6644.
•
Pressurised system to comply with BS 7074.
•
It is recommended that the system pipework is flushed twice before water treatment.
•
In hard water areas (>180mg CaCO
3
/litre) precautions such as water treatment are strongly recommended to
prevent the build up of sludge and scale and also to control the system water pH to between 7.0 & 8.0.
•
Leaks in the system pipework should be fixed to prevent dilution of water treatment.
•
Maximum working water pressure is 7 bar.
•
For minimum water pressure see Appendix E .
Rp 3/4” Gas Connection
Содержание Sherborne Series
Страница 2: ......
Страница 10: ...HAMWORTHY HEATING LTD 8 SHERBORNE 500001167 E 4 Boiler Layout Description 4 1 Accessory Pack...
Страница 27: ...HAMWORTHY HEATING LTD 25 SHERBORNE 500001167 E...
Страница 29: ...HAMWORTHY HEATING LTD 27 SHERBORNE 500001167 E 8 9 Wiring Diagram...
Страница 30: ...HAMWORTHY HEATING LTD 28 SHERBORNE 500001167 E 8 10 Wiring Diagram LMU...
Страница 39: ...HAMWORTHY HEATING LTD 37 SHERBORNE 500001167 E External Control Wiring for Multiple Module Installation...
Страница 53: ......
Страница 54: ......