Ensbury LT 70 - 580
We reserve the right to make changes to dimensions and construction
6
edition 12.2020
Hamworthy Heating Limited – Dorset BH17 ONF
3. Scope of supply
-
Boiler body, flue gas collector and flue gas tube
-
Gas-tight boiler door, with insulation and burner connection
-
Furnace sight glass integrated in the boiler door
-
Supply and return tubes with flanges, counter flanges, gaskets and screws
-
Filling and discharge tubes
-
Automatic venting valve
-
Flue gas turbulators
-
Boiler insulation
-
All-around casing (packed separately)
-
Heat and sound proofing hood or front isolation (optional)
-
Boiler control panel (version depending on order)
-
Burner pipe insulation material (supplied loose)
-
Cleaning set
-
Installation and operating instructions
4. Technical data / Dimensions
4.1. Main data / operating conditions
Max. operating pressure
4,0 bar g
Test pressure
(other pressures on request)
6,0 bar g
Min. operating pressure
0,5 bar g
Boiler supply and return pipe flanges
PN 6
Safety cut-out temperature
110 °C
Max. operating temperature
90 °C
Operating temperatures
With Ygnis control:
no restrictions
Without Ygnis control:
- Min. operating temperature
with fuel oil
50 °C
with natural gas
60 °C
with propane
60 °C
- Min. return temperature
15 °C
Min. flue gas temperature:
with fuel oil
S-content: 50 ppm
100 °C
500 ppm
110 °C
0.1%
115 °C
0.2%
120 °C
with natural gas
0.5%
S-content: 10 mg/nm3
150 mg/nm3
125 °C
95 °C
110 °C
Max. CO
2
-content
with fuel oil
15.5%
(dry flue gas)
with natural gas
11.7%
with propane
13.7%
4.2. Water quality
The following rules apply once the boiler is put into service and remain valid until the end of life of the product.
Preparing the water system before putting the boiler into service
For any installation (new or renovation), the water system pipes must be thoroughly cleaned. The purpose of this
initial cleaning is to eliminate germs and residue that can cause deposits to form.
Содержание Ensbury LT 120
Страница 2: ......