
HAMWORTHY HEATING LTD
Page
PUREWELL Vari
Heat he
500001170/K
2
ii
CONTENTS
PAGE
1.0 INTRODUCTION
.................................................................................................................................
1
2.0
SUPPLY AND DELIVERY
..................................................................................................................
2
3.0
SIZE AND SPACE REQUIREMENTS
................................................................................................
4
4.0
SITE LOCATION AND PREPARATION
............................................................................................
6
4.1
Site
Location
4.2
Gas
Supply
4.3
Flues
4.4
Water
Supply
4.5
Condensate
Connections
4.6
Electrical
Supply
5.0 BOILER
ASSEMBLY
........................................................................................................................
11
5.1
Flue
Pipe
5.2
Water
Connections
5.3
Electrical
Connections
6.0 PRE-COMMISSIONING
....................................................................................................................
13
6.1
Gas
Supply
6.2
Ventilation
6.3
Pipework, Valves and Pump
6.4
Flue
6.5
Electrical
7.0
CHECKS PRIOR TO LIGHTING
......................................................................................................
14
7.1
Boiler Gas System Leak Check
7.2
Checks Prior to Lighting the Boiler
7.3
Initial
Lighting
7.4
Combustion
Checks
7.5
User
Instructions
8.0 BOILER
CONTROLS
........................................................................................................................
20
8.1
Controls
Operation
8.2
Standby
8.3
Pump
Kick
8.4
Lockout
8.5
Heat
Demand
8.6
Data
Logging
8.7
Fault
Error
Code Display ...................................................................................................................
30
9.0 FAULT
FINDING
...............................................................................................................................
36
10.0 SERVICING
.......................................................................................................................................
36
11.0 REPLACEMENT
OF
FAILED COMPONENTS
................................................................................
38
11.1
Igniter and Flame Probe Assembly
11.2
Temperature
Limiter
11.3
Main Gas Valve
11.4
Combustion
Fan
12.0 RECOMMENDED
SPARES
.............................................................................................................
44
Содержание 65he
Страница 2: ......
Страница 30: ...HAMWORTHY HEATING LTD 24 PUREWELL VariHeat he 500001170 K Figure 8 2 1 3 Operation and display philosophy...
Страница 40: ...HAMWORTHY HEATING LTD 34 PUREWELL VariHeat he 500001170 K Figure 8 3 11 Operating phases...
Страница 41: ...HAMWORTHY HEATING LTD 35 PUREWELL VariHeat he 500001170 K Figure 9 0 Boiler Wiring Schematic...
Страница 65: ......
Страница 66: ......