
HAMWORTHY HEATING LTD
9
PUREWELL
Vari
Heat he
500001170/K
4.5 Condensate Connections
•
Provision must be made for removal of condensate from the boiler and flue system.
•
Condense is mildly acidic, typically pH 3 - pH 5.
•
Condense pipework must be non-corrosive and not copper. Hamworthy recommend
32mm dia. Plastic waste pipe.
•
Condense may be discharged to a standard drain subject to National or Local
regulations.
Boiler Condensate
Connection
(32mm o/d)
Figure 4.5.1 - Boiler Condensate Connection
Figure 4.5.2 – Boiler Condensate Connection
•
Location of condense
pipework should prevent
f r e e z i n g w i t h i n
tundishes, traps and
pipework.
•
Do not allow blockage or
d a m a g e t o t h e
condensate trap.
•
The connection to the
boiler condense drain
accepts a straight push-
fit coupling for 32mm i.d.
plastic waste pipe.
Содержание 65he
Страница 2: ......
Страница 30: ...HAMWORTHY HEATING LTD 24 PUREWELL VariHeat he 500001170 K Figure 8 2 1 3 Operation and display philosophy...
Страница 40: ...HAMWORTHY HEATING LTD 34 PUREWELL VariHeat he 500001170 K Figure 8 3 11 Operating phases...
Страница 41: ...HAMWORTHY HEATING LTD 35 PUREWELL VariHeat he 500001170 K Figure 9 0 Boiler Wiring Schematic...
Страница 65: ......
Страница 66: ......