
18
Hampton
®
H27 Direct Vent Freestanding Gas Stove
INSTALLATION
Horizontal Venting with Two (2) 90
o
Elbows
Option V
H + H1
A)
2' Min. 4' Max.
B)
3' Min. 5' Max.
C)
4' Min. 6' Max.
D)
5' Min. 7' Max.
E)
6' Min. 8' Max.
Horizontal Venting with Two (2) 90
o
Elbows
Option H
V
H + H1
A)
1' Max. 1' Min. 3' Max.
B)
2' Max. 2' Min. 5' Max.
C)
3' Max. 4' Min. 6' Max.
D)
4' Max. 6' Min. 7' Max.
E)
5' Max. 8' Min. 8' Max.
With these options, max.
total pipe length is 30 feet
with min. of 8 feet total
vertical and max. 8 feet
total horizontal.
Please note min. 1 foot
between 90
o
elbows is
required.
With these options, maxi-
mum total pipe length is 30
feet with minimum of 6 feet
total vertical and maximum
8 feet total horizontal.
Please note minimum 1
foot between 90
o
elbows
is required.
One 90
o
elbow = Two 45
o
elbows.
One 90
o
elbow = Two 45
o
elbows.
H
H1
V
Vent restrictor position A (fully open), refer to the
"Vent Restrictor Position" section.
Vent restrictor position A (fully open), refer to the "Vent
Restrictor Position" section.
Lengths do not include elbow indicated
Lengths do not include elbow indicated