background image

26

 | 

Hampton® H15-10 Direct Vent Freestanding Gas Stove

 | 

26

installation

Please review your product to make sure you have 
everything  you  need.  In  the  event  that  you  are 
missing any part, contact your dealer. 

Note:  These are the minimum pieces required. 

Other  parts  may  be  required  for  your 

particular installation. See above for a 

list of vent parts.

If installing termination on a siding covered wall, 
a  vinyl  siding  standoff  or  furring  strips  can  be 
used in order to ensure that the termination is not 
recessed into siding.

The vinyl siding standoff is required for walls with 
vinyl siding.

Minimum components for a Dura-Vent Horizon-
tal Installation:

A)  Dura-Vent Horizontal Termination Kit
B)  Wall Thimble (required for combustible walls)

Minimum components for a Dura-Vent Vertical 
Termination:

D)  Dura-Vent Vertical Termination Kit. See above 

for pipe lengths.

 

Diagram 2a

HORIZONTAL TERMINATIONS

1)

  Set the unit in its desired location. Check to 

determine if wall studs are in the way when the 
venting system is attached. If this is the case, 
you may want to adjust the location of the unit.

2)

  Assemble  the  desired  combination  of  pipe 

and elbow to the appliance adapter with pipe 
seams oriented down. Offset the pipe seams 
as double seams in one place will cause the 
outer  pipe  to  take  an  oval  shape.  Kit  comes 
complete with 18" of straight vent - 6-5/8" dia. 
black outer pipe and 4" dia. inner vent. 

3)

  With the pipe attached to the stove, slide the 

stove  into  its  correct  location,  and  mark  the 
wall for a   9-1/2"  (inside  dimensions)  round 
hole. The center of the round hole should line 
up with the centerline of the horizontal pipe, as 
shown in diagram 1. Cut and frame the 9-1/2 
round hole in the exterior wall where the vent 
will be terminated. If the wall being penetrated 
is constructed of non-combustible material, i.e. 
masonry block or concrete, a  7" diameter hole 
is acceptable.

a)

  The horizontal run of vent should have a 1/4 

inch rise for every 1 foot of run towards the ter-
mination. Never allow the vent to run downward. 
This could cause high temperatures and may 
present the possibility of a fire.

b)

  The  location  of  the  horizontal  vent  termina-

tion  on  an  exterior  wall  must  meet  all  local 
and national building codes, and must not be 
blocked or obstructed. Refer to the "Exterior 
Vent Terminal Locations" section.

c)

 

Snorkel Terminations:

 

For installations requiring a vertical rise on the 
exterior of the building, 14-inch and 36-inch tall 
Snorkel Terminations as shown in Diagram 2 
are  available,  as  well  as  the  standard  Riser 
Vent. Follow the same installation procedures 
as used for standard Horizontal Termination. 
NEVER install the snorkel upside down.

 

 

Below Grade Snorkel Installation

 

If  the  Snorkel Termination  must  be  installed 
below grade, i.e. basement application, proper 
drainage  must  be  provided  to  prevent  water 
from entering the Snorkel Termination. Do not 
attempt to enclose the Snorkel within the wall, 
or any other type of enclosure.

Diagram 1

*Diagram 2a: As specified in CGA B149 Installa-
tion Code. Local codes or regulations may require 
different clearances.

Diagram 2b

NOTE:  For  Snorkel  terminations    in  ABOVE  

grade  installations,  follow  national  or 

local code requirements.

4)

  Install wall penetration heat shield in the center 

of the 9-1/2" round hole and attach with wood 
screws. The four wood screws provided should 
be  replaced  with  appropriate  fasteners  for 
stucco, brick, concrete, or other types of sidings. 
Diagram 3.

5)

   If  installing  termination  on  a  siding  covered 

wall,  a  vinyl  siding  standoff  or  furring  strips 
must be used to ensure that the termination is 
not recessed into the siding.  Diagram 3.

6)

  Take the Riser Vent terminal and separate the 

Backing  Plate  from  the  Riser  Vent  Front  by 
removing 8 screws as shown in diagram 4.

7) 

Install the Backing Plate into the wall penetration 
heat shield and attach using 4 screws. Dia. 4.

8)

  Connect all pipe sections to unit and install into 

wall:

a)

  Measure pipe length required and cut to length. 

Hint: use the cut end of the 6-5/8" dia. outer 
pipe at the vent terminal end.

Diagram  3

Содержание H15-NG10

Страница 1: ...mable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your bu...

Страница 2: ...d appliance and has been designed to provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model H15 10 has been approved by Warnock Hersey Intertek for both safet...

Страница 3: ...ensions with vertical vent 5 Installation Important Message 8 Specifications 8 Mobile Manufactured Homes After First Sale 8 Before You Start 8 General Safety Information 9 Installation Checklist 9 Cle...

Страница 4: ...RIZONTAL VENT 22 7 8 19 3 8 24 11 16 20 11 16 17 13 16 19 1 8 14 1 4 13 5 8 21 1 4 19 1 8 525mm 451mm 485mm 540mm 626mm 581mm 492mm 345mm 485mm 361mm ALL PICTURES DIAGRAMS SHOWN THROUGHOUT THIS MANUAL...

Страница 5: ...Hampton H15 10 Direct Vent Freestanding Gas Stove 5 5 dimensions UNIT DIMENSIONS WITH VERTICAL VENT...

Страница 6: ...ements minimaux aux mat riaux combustibles Serial No No de s rie 919 447a This appliance must be installed in accordance with local codes if any if none follow the National Fuel Gas Code ANSI Z223 1 o...

Страница 7: ...directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT...

Страница 8: ...make you aware of the following CLOTHING OR OTHER FLAMMABLE MATERIAL SHOULD NOT BE PLACED ON OR NEAR THE APPLIANCE INSTALLATION AND REPAIR SHOULD BE DONE BY AN AUTHORIZED SERVICE PERSON THE APPLIANCE...

Страница 9: ...ssageways of the appliance be kept clean and free from excessive lint from carpeting 4 See general construction and assembly in structions The appliance and vent should be enclosedwheninstalledinorpas...

Страница 10: ...nce is set as indicated in one of the figures but the connector is too close move the stove until the correct clearance to the connector is obtained This appliance may be installed only with the clear...

Страница 11: ...as shown On either side of the unit there will be slits located on the body of the stove Slide the fan up into the slits until the mounting holes line up with the holes locatedonthefanassembly Secure...

Страница 12: ...tches securing glass door and remove door 1 Open the front panel and remove the cover plate by removing two screws 6 To reinstall reverse steps 3 Remove 2 bolts and lift off cast front place front car...

Страница 13: ...ts products of combustion to the outside while the outer pipe draws outside combustion air into the combustion chambertherebyeliminatingtheneedtouseheated room air for combustion and losing warm room...

Страница 14: ...of center line extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air i...

Страница 15: ...stable Length 7 Galvanized N A N A 4D7A N A N A N A N A Adjustable Length 7 Black N A N A 4D7AB N A N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A N A Extension Pipe 8 1 2 B...

Страница 16: ...N A N A N A N A N A TM 4ST36 N A Basic Horizontal Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK TM4 HTK VDV KW04 Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB S...

Страница 17: ...Vent SelkirkDirect Temp AmeriVent Direct venting and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of...

Страница 18: ...et with min of 8 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required With these options maxi mum total pipe length is 30 feet with minimum of 6 fe...

Страница 19: ...ote min 1 foot be tween90o elbowsisrequired Option H H1 V A 2 Max 2 Min B 3 Max 3 Min C 4 Max 4 Min D 5 Max 5 Min E 6 Max 6 Min With these options max total pipelengthis30feetwithmin of6feettotalverti...

Страница 20: ...tibles May be installed in Manufactured Mobile Homes after first sale Horizontal Terminations for All Venting Systems The shaded areas in the diagram below show all allowable combinations of vertical...

Страница 21: ...m flue lengths See chart below for minimumdistancesfromroof Periodicallycheck that the vent is unrestricted Masonry chimneys may take various contours which the flexible liner will accommodate However...

Страница 22: ...pipe to length Attachthe 45o elbowtotherigid pipe and ensure that the pipe length when cut with the 45o elbow will seat onto both the starter collar and the 90o elbow Crimpedsectionofrigidpipe seats...

Страница 23: ...hardening mastic should be run around both the termination and vinyl siding standoff to prevent water from entering and to make a tight seal between the cap and the standoff 7 Stretch the 4 dia flex...

Страница 24: ...6 5 8 Dia x 18 Black Pipe 1 4 Dia x 18 Aluminum Vent 1 946 202 Wall Penetration Heat Shield Wall Thimble 2 pcs 1 640 530 P Riser Vent Terminal 1 640 545 P Decorative Wall Trim Black 1 948 128 Tube Mil...

Страница 25: ...stible surfaces is 1 1 4 inch Be sure to check the vent termination clearance requirements from decks windows soffits gas regulators air supply inlets and public walkways as specified inthe ExteriorVe...

Страница 26: ...inch rise for every 1 foot of run towards the ter mination Neverallowtheventtorundownward This could cause high temperatures and may present the possibility of a fire b The location of the horizontal...

Страница 27: ...ly recommended to apply Mill Pac sealant supplied to every inner pipe connection Failure to do so may result in drafting or performance issues not covered under warranty Diagram 5 c Before connecting...

Страница 28: ...is installed under the roofing material and not nailed down until the chimney is installed This allows for small adjustments Note If an offset is necessary in the attic toavoidobstructions itisimporta...

Страница 29: ...lot Ignition atalltimes Thiswillavoidnuisance pilot outages during operation of this appli ance See Remote manual for setup of this IPI CPI switch 1 Remove the existing chimney cap 2 Measure the dista...

Страница 30: ...imney in a convenient location as near as possible to the appliance outlet Cut and frame a hole in the roof for the support The sides of this hole must be vertical with 1 1 4 clearance 2 Place the sup...

Страница 31: ...specified on the safety label 6 When finished reading manometer turn off the gas valve disconnect the hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do...

Страница 32: ...he pilot orifice with the allen key and replace with the LP pilot orifice in the kit and replace pilot cap 7 Remove burner orifice with a 1 2 wrench and discard Use another wrench to hold on to the el...

Страница 33: ...Center Front Log e Embers f Platinum Embers 946 669 supplied with packaged manual Left Front Log Right Front Log 4 Remove Glass front see instructions in manual 3 Remove Cast Front and set the light a...

Страница 34: ...of burner to the other If there is any flame hesitation check that area for any blockage of the burner ports 11 Re install the Glass Front Cast Front and Top 8 Take the embers and place on the burner...

Страница 35: ...nit may be operated by a back up battery system 1 Open the right when facing front of appliance access panel by removing 1 screw 2 Install 4AA batteries into the battery holder Note Remove the batteri...

Страница 36: ...Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong recep tacle Do...

Страница 37: ...Hampton H15 10 Direct Vent Freestanding Gas Stove 37 37 operating instructions WIRING DIAGRAM WITH THERMOSTAT Thermostat Optional Millivolt...

Страница 38: ...lipping the main ON OFF switch located behindthefrontcoverplate totheOFFposition IMPORTANT The remote control system supplied with this appliance has several options for starting operatingtheappliance...

Страница 39: ...oard will go into lock out The system will need to be reset as follows a Wait 5 minutes turn the system off by pressing the ON OFF button on the remote b After approximately 2 seconds turn on ON OFF s...

Страница 40: ...nsult a qualified installer service agency or gas supplier AVERTISSEMENT Quiconque ne respecte pas la lettre les instructions dans la pr sente notice risquede d clencher un incendie ou une explosion e...

Страница 41: ...the thermocouple and 1 flowing across the rear of the burner it does not have to be touching the burner Note If you have an incorrect flame pattern contactyourHampton dealerforfurther instructions Nev...

Страница 42: ...ch as Wall Straps or plumbers tape for rigidity LOG REPLACEMENT Theunitshouldneverbeusedwithbrokenlogs Turn off the gas valve and allow the unit to cool before opening door to carefully remove the log...

Страница 43: ...ve 2 bolts and lift off cast front place front carefully on a soft surface 1 Turn off stove and allow to return to room temperature 2 Shut off electrical supply 3 Lift off cast top and place on a soft...

Страница 44: ...two 2 switch wires from valve 5 Lift off the Cast Top and remove the Cast Front and glass door see detailed instruction in this manual 6 Carefully move light bracket out of the way Screws 7 Carefully...

Страница 45: ...e Comes With Legs 2 Per Side Sea side Sand W801015 Touch Up Paint Brown 938 317 Touch Up Paint Seaside Sand 9 382 515 Rear Panel Assembly 11 382 516 Valve Cover Assembly 12 382 005 Safety Screen Assy...

Страница 46: ...rgrated Fireplace Control Proflame 11 584 306 911 175 Hand Held Remote Control GTMFL 0 584 042 911 179 ASM 120 Volt Power Cord Assembly 911 173 Valve Remote Wiring Harness 584 924 911 177 4 Position W...

Страница 47: ...Hampton H15 10 Direct Vent Freestanding Gas Stove 47 47 notes...

Страница 48: ...dule Battery Pack Remote Control Systems 2 Enamel Panels 1 Venting Venting Components 1 All Stainless steel surrounds 1 All Firebox Media Crystals Firebeads Volcanic Ceramic Spa Stones 1 All hardware...

Страница 49: ...ages downdrafts installation error installation by an unqualified installer incorrect chimney components including but not limited to cap size or type operator error abuse misuse use of improper fuels...

Страница 50: ...nal legal codes for additional terms which may be applicable to this warranty How to Obtain Warranty Service Customers should contact the authorized selling dealer to obtain warranty service In the ev...

Страница 51: ...below in order for us to serve you better Warranty Registration Form or Register online immediately at the above Web Site Warranty Details Serial Number required Purchase Date required mm dd yyyy Pro...

Страница 52: ......

Страница 53: ...Hampton H15 10 Direct Vent Freestanding Gas Stove 53 53 notes...

Страница 54: ...54 Hampton H15 10 Direct Vent Freestanding Gas Stove 54 notes...

Страница 55: ......

Страница 56: ...e Address _______________________________________________ ___________________________________________________________________ Installer ____________________________________________________________ Pho...

Отзывы: