Preparations
Before First Use:
Remove ALL packing
materials from garment steamer.
w
CAUTION
Burn Hazard: Escaping steam is hot. Ensure base
of hose is fully inserted as directed. If steam is leaking around
base of hose, turn off and allow to cool before attempting to
adjust the base of hose.
1. Remove any label or protective covering from
the appliance.
2. Place the steamer base (11) horizontally on a
solid, flat place.
3. Press the release button (16) to insert the
telescopic pole
(6) into the base and make sure it locks into
position.
4. Insert the garment hanger into the pole and
click it into position. Fix the two halves of the
hanger together by locking the metal clip on one
half into the groove in the other half.
5. Loosen the two pole fixing clips (7) on the
telescopic pole
to allow adjusting of the pole to a desired length.
6. Extend upward the telescopic pole to a suitable
height, and fasten the two fixing clips again to
lock the pole in position.
7. Put the steam nozzle (1) onto the nozzle rack (9).
8. Fetch the water tank (12) and turn the lid (13)
anticlockwise
to open it, fill in the tank through the refilling
opening with tap water.
9. Close the lid and put the water tank back to the
steamer base.
Содержание 11551-IS
Страница 2: ......
Страница 10: ......
Страница 11: ...9 1 18 2 16 3 4 5 6 1 4 3 2 14 3 18 4 16 5 6...
Страница 12: ...8 21 1 2 3 22 1 2 23...
Страница 13: ...7 1 17 15a 2 14 15a 3 14 15d 15c 15b 4 10 8 4 3 5 9 15 3...
Страница 14: ...6 1 2 11 3 16 6 4 5 7 6 7 7 9 1 8 13 12 100 BRITA 9 11...
Страница 15: ...5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 a b c d 16 17 18 19 20 21 22 23...
Страница 16: ...4 3 220V 240V 50Hz WEEE EC 2002 96...
Страница 17: ...3...
Страница 18: ...2 220V 240V 50Hz 220V 240V 50Hz...
Страница 19: ......
Страница 20: ...www hamiltonbeach co il 1983 052 528914455 sherut shaoulian co il 12 09 00 18 00 11551 IS...