EXPANSION VESSEL

A diaphragm type expansion vessel, conforming to the current
issue of BS4814 (see also BS7074 Part 1 and 2) must be
connected at a point close to the inlet side of the circulating
pump, see the diagrammatic layout, figure 7 unless laid down
differently by the manufacturer.
The expansion vessel volume depends on the total water system
volume and the initial system design pressure. For any system an
accurate calculation of vessel size is given in the current issue of
BS5449 and BS7074 Part 1.
Example: For an initial design pressure of 0.7 bar, the minimum
total vessel volume required is 0.063 x Total System Volume.

APPLIANCE

NON RETURN

VALVE

3-WAY

VALVE

HOT WATER
CYLINDER

TANK
THERMOSTAT

DRAIN
COCK

AIR RELEASE
VALVE

AUTOMATIC
AIR VENT

MAKE UP BOTTLE
Observe minimum
static head requirements

PUMP

PRESSURE
GAUGE

EXPANSION
VESSEL

SAFETY

VALVE

FILL POINT
NON-RETURN
VALVE

MOTORISED

VALVE

FLOW

RETURN

ROOM
THERMOSTAT

TERMINAL

BLOCK 

DIRECT HW
CONNECT

CH SWITCH

220V RELAY BOX

(Optional)

CH/DHW
2 CHANNEL
PROGAMMER

7

SEALED WATER SYSTEM

NOTE: 

No automatic by-pass required. However it is

recommended to leave one radiator open and to fit a
system bypass in the DHW circuit to ensure pump over-
run functionality.

3.18

PRESSURE GAUGE

A pressure gauge with a set pointer and covering at least 0 to 4
bar (0 to 60 lb/in) shall be fitted permanently to the system in a
position where it can be seen when filling the system.

Note: A higher initial design pressure requires a larger volume
expansion vessel.
The charge pressure must not be less than the static head of the
system, that is, the height of the highest point of the system above
the expansion vessel.
The water content of the boiler is given in 2.3 General Specifications.

Expansion Vessel Requirements

Vessel charge and

bar

0.5

0.75

1.0

1.5

initial system pressure
Total water content of system
using 8 L  (1.54 gal) capacity

L

96

84

73

50

expansion vessel supplied
with appliance.
For systems having a larger
capacity multiply the total system
capacity in litres (gallons) by

0.0833 0.093 0.109 0.156

these factors to obtain the total
minimum expansion vessel
capacity required in litres.

3.19

WATER MAKEUP

Provision should be made for replacing water loss from the system
using a make up bottle mounted in a position higher than the top
point of the system, connected through a non-return valve to the
return side of either the heating circuit or the hot water cylinder.
Alternatively, provision for make up can be made using a filling loop.

INTERNAL WIRING DIAGRAMS

7

7.1 : FUNCTIONAL FLOW WIRING DIAGRAM

31

25

Содержание VBX 18

Страница 1: ...T R A I N I N G 0 1 9 2 6 8 3 4 8 3 8 Halstead Boilers Limited 20 22 First Avenue Bluebridge Industrial Estate Halstead Essex C09 2EX Telephone 01787 272800 Sales Direct Line 01787 475557 Fax 01787 47...

Страница 2: ...nctional Flow Wiring Diagram 25 8 FAULT FINDING 26 8 1 General 26 8 2 Diagnostic LED Indicators 26 8 3 Faulting Finding Codes 26 8 4 Central Heating Fault Finding 26 9 REPLACEMENT OF PARTS 28 9 1 Igni...

Страница 3: ...appliance are cured and give no known hazard in this state Insulation Pads These can cause irritation to skin eyes and the respiratory tract If you have a history of skin complaints you may be suscept...

Страница 4: ...8 9 kg h 2 36 1 43 Seasonal Efficiency 90 4 91 0 92 4 93 1 Seasonal Efficiency SEDBUK Band A Nox Classification Class 5 Min Central Heating System Pressure Bar 0 1 1 m H2O Max Central Heating System P...

Страница 5: ...ue max rate Propane 0 019 0 005 Flue products mass flow rate Nat Gas g s 13 7 8 3 Flue products mass flow rate Propane g s 13 7 8 3 Gas Valve Offset min rate Pa 3 0 Connections Gas 15 mm compression C...

Страница 6: ...user interface from its housing see figure 22 c Lower the controls front d Unplug the electrical leads from the PCB Refer to section 7 e Unplug the BCC boiler chip card if fitted f Remove the PCB pla...

Страница 7: ...m Roof terminal with rain cover and pitched roof flashing kit a b 3c If the standard horizontal terminal is likely to cause nuisance to neighbours or buildings because of excess pluming then this part...

Страница 8: ...ded that to prevent dust the insulation be dampened prior to removal and that a protective mask is worn when changing or handling the insulation material Refer to Figure 43 a Ensure supply voltage is...

Страница 9: ...me equivalent length 45 Extension Elbow Allows an additional bend in the flue and has an equivalent length of 775 mm Vertical Turret Socket For use with elevated horizontal flues and vertical terminal...

Страница 10: ...e that all joints and seals are correctly re fitted Note The gas control valve is factory set and sealed and is not adjustable If the gas control valve is changed then when the appliance is running th...

Страница 11: ...imitations MUST be observed when siting the appliance a The appliance is not suitable for external installations The position selected for installation should be within the building unless otherwise p...

Страница 12: ...The complete installation must be tested for gas tightness 3 7 CENTRAL HEATING SYSTEM a The appliances are designed for open vented central heating water systems but may be fitted to a sealed central...

Страница 13: ...INDER SINGLE FEED INDIRECT CYLINDERS ARE NOT SUITABLE The domestic hot water cylinder must be of the double feed fully indirect coil type 3 15 SEALED WATER SYSTEMS The installation must comply with th...

Страница 14: ...cuit to ensure pump over run functionality 3 18 PRESSURE GAUGE A pressure gauge with a set pointer and covering at least 0 to 4 bar 0 to 60 lb in shall be fitted permanently to the system in a positio...

Страница 15: ...plete electrical isolation of the appliance Either a 3A fused three pin plug and un switched shuttered socket outlet both complying with BS 1363 or a 3A fused double pole switch having a 3 mm contact...

Страница 16: ...per template in the required position ensuring that the necessary clearances are achieved Ensure squareness by hanging a plumb line b Mark the position of the wall mounting plate fixing holes 4 c Mark...

Страница 17: ...products are available from Grundfos Pumps Ltd on 01525 850000 and Pump House on 0115 922 2211 22 ROUTINE SERVICING 6 6 1 COMBUSTION CHECK The appliance incorporates a flue sampling point on the appli...

Страница 18: ...flue elbow e Fit the flue terminal to the flue system ensuring that the duct joints are not disturbed and that the external sealing ring is seated against the outside wall f Finally use the internal...

Страница 19: ...cluded in the appliance specification ANTI CYCLE DEVICE When the appliance cycles on its central heating control thermostat a slow cycle device operates The timer set to 5 minutes is activated after t...

Страница 20: ...s tightness in accordance with BS 6891 1988 Open all doors and windows extinguish naked lights and DO NOT SMOKE whilst purging the gas line It is recommended where possible to flush the CH system with...

Отзывы: