background image

5

OVLERQ*C  OVLSRQ*C  OVLESRQ*F  OVLSERQ*F

97793C - 10/01

Legend

Item

Description

A

3/8” O.D. Tube - Water Outlet Connection

B

3/8” O.D. Tube - Water Inlet Connection

C

1-1/4” O.D. Tube - Waste Tube - 

Not provided

D

Electrical Inlet on Chiller

Figure 8 – OVL-II SER-Q/OVL-II ESR-Q Rough-In Dimensions

5.

Install the frame assembly squarely in wall

 opening

with frame upright support edges flush with the

finished wall face. Secure the frame to the wall

through holes with (12) 5/16” bolts or screws (not

provided). Tighten securely.

NOTE:

Be sure that frame is squared in location. Do

not use less than required screw quantity

and size.

6.

Attach the chiller shelf support rods

 to the right side

of the frame uprights at the second set of holes

counting from the bottom and to the shelf at the (2)

side holes. Line up the other shelf holes with the

frame bottom holes and fasten the assembly to the

wall opening using appropriately sized screws or

bolts and nuts (not provided).

All manuals and user guides at all-guides.com

Содержание OVL-II ER-Q

Страница 1: ...o be performed by authorized service personnel only INSTALLER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can...

Страница 2: ...2 2 23 45398C Drain Plug A G 1 1 2 2 23 11 45683C Drain Tube 1 1 1 23 45682C Drain Tube 1 1 1 23 12 100023340560 Waste Tube Gasket 1 1 2 2 23 13 161570808550 Slip Nut 1 1 2 2 23 14 61314C Regulator 1...

Страница 3: ...Adjustment 1 1 2 2 21 22797C Upper Panel OVL II ER S S 1 13 23 27885C Upper Panel OVL II ER A G 1 13 23 22799C Upper Panel OVL II SR S S 1 13 23 32 27887C Upper Panel OVL II SR A G 1 13 23 26958C Upp...

Страница 4: ...frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install plumbing and electrical rou...

Страница 5: ...all face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quanti...

Страница 6: ...sides to adequately support the water fountain This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in place NOTE Building construction must a...

Страница 7: ...ion A 3 8 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Tube Waste Tube Not provided D Electrical Inlet on Chiller Figure 11 OVL II ER Q SR Q Rough In Dimensions n...

Страница 8: ...Install chiller Remove front panel of chiller Remove and discard cardboard inner pack from between compressor and side panel Slide chiller onto the shelf and position it to the left within the guides...

Страница 9: ...igure 20 by removing the screws holding assembly together and adjust the screw on the regulator Item 26 Figure 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Страница 10: ...tors which utilize an o ring water seal To remove tubing from the fitting relieve water pressure push in on the gray collar while pulling on the tubing See Figure 19 To insert tubing push tube straigh...

Страница 11: ...Figure 22 Regulator Assembly Figure 23 Fountain Assembly Side View 23 14 24 REGULATOR MOUNTING BRACKET 15 7 18 10 6 5 See Fig 20 3 4 16 21 See Fig 22 32 8 17 12 13 9 1 See Fig 21 8 11 All manuals and...

Страница 12: ...VLSRQ C OVLESRQ F OVLSERQ F 97793C 10 01 2222 CAMDEN COURT OAKBROOK IL60523 630 574 3500 PRINTEDINU S A FOR PARTS CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1 800 323 0620 All manuals and user guides at a...

Отзывы: