5.   Install fountain: Remove access cover plate on

      underside of fountains and SAVE the screws. Mount

       the fountains to the upper panel and frame with

       (4) 5/16” x 3/4” (19mm) long bolts and nuts provided.

       Tighten securely.

6.

Remove elbow from end of p-trap

 and attach it to

drain tube. Re-attach elbow to p-trap and cut waste

tube to required length using plumbing hardware and

trap as a guide.

7.

Make connection between remote chiller outlet tube

and fountain strainer.

 Insert the water inlet line into

inlet side of strainer by pushing it in until it reaches a

positive stop, approximately 3/4” (19mm). Turn on

water supply and check for leaks.

REQUIRED TOOLS AND MATERIALS

These tables show special tools and/or additional

materials (not provided) which are necessary to complete

installation of these units:

Special Tools

Item

Description

Quantity

NONE

Additional Materials

I

tem

Description

Quantity

1

Unplated copper inlet pipe

2

Service St

op

OVL-II ER-Q/SR-Q/SER-Q/ESR-Q INSTALLATION

1. Assemble and place frame in wall as shown on

preceding pages.

2.

Install chiller:

 Remove front panel of chiller. Remove

and discard cardboard inner pack from between

compressor and side panel. Slide chiller onto the

shelf and position it to the left within the guides on the

shelf.

NOTE:

Building construction must allow for

adequate air flow on both sides, top and

back of chiller. A minimum of 4” (102mm) on

both sides and top is required. See chiller

installation for additional instructions.

3. Make water supply connections: Attach an unplated

copper water inlet line and a service stop (not

provided) to the chiller. Inlet port is marked on the

chiller (3/8” O.D. copper tube). Bend the copper tube

(provided) at an appropriate length from the chiller to

opening in frame. Install a 3/8” O.D. tube tee fitting

(provided) on the marked chiller outlet port. Turn on

the water supply and flush the line thoroughly.

4.

Hang the upper panel on the mounting frame

hanger:

 Align holes in the panel with the holes in the

mounting frame. Be sure that panel is engaged with

hanger at top of frame before releasing it.

Note:

  With OVL-II SER-Q or OVL-II ESR-Q models, the

           standard reach fountain must be mounted at the

           upper position on panel.

Figure 12 – Chiller Installation

Figure 14 – Fountain Installation

Figure 13 – Upper Panel Installation

All manuals and user guides at all-guides.com

Содержание OVL-II ER-Q

Страница 1: ...o be performed by authorized service personnel only INSTALLER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can...

Страница 2: ...2 2 23 45398C Drain Plug A G 1 1 2 2 23 11 45683C Drain Tube 1 1 1 23 45682C Drain Tube 1 1 1 23 12 100023340560 Waste Tube Gasket 1 1 2 2 23 13 161570808550 Slip Nut 1 1 2 2 23 14 61314C Regulator 1...

Страница 3: ...Adjustment 1 1 2 2 21 22797C Upper Panel OVL II ER S S 1 13 23 27885C Upper Panel OVL II ER A G 1 13 23 22799C Upper Panel OVL II SR S S 1 13 23 32 27887C Upper Panel OVL II SR A G 1 13 23 26958C Upp...

Страница 4: ...frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install plumbing and electrical rou...

Страница 5: ...all face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quanti...

Страница 6: ...sides to adequately support the water fountain This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in place NOTE Building construction must a...

Страница 7: ...ion A 3 8 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Tube Waste Tube Not provided D Electrical Inlet on Chiller Figure 11 OVL II ER Q SR Q Rough In Dimensions n...

Страница 8: ...Install chiller Remove front panel of chiller Remove and discard cardboard inner pack from between compressor and side panel Slide chiller onto the shelf and position it to the left within the guides...

Страница 9: ...igure 20 by removing the screws holding assembly together and adjust the screw on the regulator Item 26 Figure 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Страница 10: ...tors which utilize an o ring water seal To remove tubing from the fitting relieve water pressure push in on the gray collar while pulling on the tubing See Figure 19 To insert tubing push tube straigh...

Страница 11: ...Figure 22 Regulator Assembly Figure 23 Fountain Assembly Side View 23 14 24 REGULATOR MOUNTING BRACKET 15 7 18 10 6 5 See Fig 20 3 4 16 21 See Fig 22 32 8 17 12 13 9 1 See Fig 21 8 11 All manuals and...

Страница 12: ...VLSRQ C OVLESRQ F OVLSERQ F 97793C 10 01 2222 CAMDEN COURT OAKBROOK IL60523 630 574 3500 PRINTEDINU S A FOR PARTS CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1 800 323 0620 All manuals and user guides at a...

Отзывы: