background image

PAGE 12

97738C (Rev. D - 4/04)

4715FR-FTN

The Following Items are included with

the 4715FR Fountain

FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1.800.323.0620

2222 CAMDEN COURT

OAK BROOK, IL 60523

630.574.3500

PRINTED IN U.S.A.

100147140560

100322740560

101570540560

15013C

15014C

110544942550

110868642550

160270508640

170705042830

28091C

40045C

400942308640

45403C

45829C

45842C

45663C

55913C

600985451640

66346C

70683C

75534C

75588C

75589C

75520C

75565C

75596C

56092C

56123C

75539C

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

NS

NS

NS

NS

NS

NS

Drain Gasket

Gasket

Drain Gasket

Bubbler Tube Assy.

Retaining Nut

Set Screw #8-32 x .125

Socket Head Screw #10-24 x .75

Strainer Plate

Basin

Nameplate Insert

Hex Nut 1-5/16"

Bubbler

Push Button Actuator

Fountain Body

Access Panel

Push Button Sleeve

Drain Adapter

Drain Plug Assy.

Drain Tube

Union 1/4"

Pinned Torx Screw #10-24

Slip Joint Nut 1-1/4"

Gasket

Bit - Pinned Torx T-25

Fitting - Double Male Connector

Paint Touch-up (Pen)

Poly Tubing - 1/4" 

(Cut To Length) - To Bubbler

Poly Tubing - 1/8" 

(Cut To Length) - To Actuator

Allen Wrench

ITEM NO.

PART NO.

PARTS LIST

DESCRIPTION

Touch-up Paint

For minor scratches a Touch-up Paint Stick is available.  For repairing large defects,

off-the-shelf aerosol paint from your local hardware store can be used.  Listed are two

suggested brandnames.

•  Brandname: X-O

•  Brandname: Ace Hardware

   XO-11 Hunter Green

   Rust Stop / Machine & Implement International Green

Trouble Shooting

Insufficient Bubbler Flow:

 

Check that the shut-off valve is wide open.  Verify

minimum 20 PSI supply pressure. Clean inlet strainer screen located in the valve body.  Clean

rubber orifice in flow control located below frost line in bushing between barb fitting and valve.

No Flow:

 

 Check for leaks in the air tubing going from the push button to the valve.  Make

sure the air tubing compression nut is hand tight.  Disconnect air tube from push button.

Place finger over air outlet. Push button to test diaphragm.  Tighten diaphragm cap screws.

Replace diaphragm if necessary.

Continued Insufficient or Varied Height of Bubbler Flow:

•

 Replace flow control.

•

 Check for kinks in the tubing.

•

 Remove the cleanout plug from the PVC column. Remove the valve assembly from the

PVC column by carefully pulling up on the strap and connecting tubing at the same time.

Pressure test the valve assembly for leaks. Check stream height from the bubbler. Stream

height is factory set at 35 PSI. If supply pressure varies greatly from this, adjust the screw

on the regulator (Item 11, Page 10, Fig. 4). Clockwise adjustment will raise stream and

counter-clockwise adjustment will lower stream. For best adjustment stream height should be

approx. 1-1/2" (38mm) above the bubbler guard. Replace the valve into the PVC column.

Make sure the supply hose coils into the bottom of the PVC column without any kinks and

double check that the valve is positioned fully at the bottom of the PVC column. Cap the

PVC column.

Continuous Bubbler Flow:

 

Insure that push button is not obstructed and springs back

to normal position. Remove four screws which secure plastic diaphragm block to valve body.

Pull plastic and rubber diaphragm assembly out of valve body.  Locate tiny hole in rubber

diaphragm just under lip of plastic part.  Clean debris from this hole.  Inspect valve seat for

grooves.  If valve seat was OK and diaphragm hole was free from debris, inspect rubber

button located at center of floating steel disc in valve diaphragm block assembly.  If button is

worn, turn disc over or replace it.  If diaphragm and seats are in good condition, stretch spring

slightly.  Spring is located behind floating stainless steel plate.  Insure that air bleed port on

valve plastic block assembly is not plugged.

Included with

SanitaryFR1

Valve

FIG. 9

30

31

38

32

39

36

34

40

37

21

18

20

19

26

25

35

24

19

23, 29

30

33

27

28

22

30

Содержание 4715

Страница 1: ... ELECTRICAL EQUIPMENT SUCH AS TELEPHONE COMPUTERS ETC TO WATER LINES IS A COMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTOAFOUNTAIN CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED AN...

Страница 2: ...y be removed for servicing the valve 5 We recommend that the top of the column be flush or slightly above the top height of the concrete pad 6 You should test the unit before you backfill Simply blow on the clear small diameter tubing A steady stream should flow from the braided tubing line When air pressure is removed from the clear tubing the water stream should stop 7 Once you have tested the v...

Страница 3: ...NEL B 1 PVC DRAIN C PRESSURE FITTING 1 1 4 x 3 4 D CONNECTOR 1 1 4 TO 1 1 4 E 1 1 4 DRAIN TUBE F AIR CONTROL LINE G 1 4 WATER LINE H CONNECTOR FOR AIR CONTROL LINE SITE PREPARATION DETAIL FOR THE 4715FR FTN WHEN USING 97243C SINGLE VALVE CONTROL ASSY FIG 1 ...

Страница 4: ...NSTALLING 97243C SINGLE VALVE CONTROL ASSY 1 Prepare trench for water supply and waste drain lines if required by local codes The hole should be deep enough to accommodate the PVC column and 5 cubic feet of porous fill large broken rock Additional porous fill may be required due to local ground conditions See Site Preparation Detail below 2 Lay drain lines and water supply lines Provide service sh...

Страница 5: ...r Push Button Actuator Fountain Body Access Panel Push Button Sleeve Regulator Holder Drain Adapter Pressure Fitting 1 1 4 To 3 4 Regulator Nut Drain Plug Assy Regulator Drain Tube Fitting 1 1 4 x 1 1 4 Tube Assy Union 1 4 Pinned Torx Screw 10 24 Fitting Double Male Connector Slip Joint Nut 1 1 4 Gasket Single Control Valve System Complete Single Control Valve Assy Rainbird Check Valve Acorn Valve...

Страница 6: ... PVC column to fit desired bury depth Set PVC column in excavating pit 2 Lay drain lines and water supply lines Provide service shut off valve for maintenance Flush the water supply line before attaching to the shut off valve Other Notes The details on the attached pages show a suggested installation method Depending on the climate and environmental conditions the suggested installation may be mod...

Страница 7: ...PAGE 7 97738C Rev D 4 04 4715FR FTN SUGGESTED SITE PREPARATION DETAIL FOR THE 4715FR FTN WHEN USING THE SANITARYFR1 VALVE FIG 1 ...

Страница 8: ...FR FTN SUGGESTED SITE PREPARATION DETAIL FOR THE 4715FR FTN WHEN USING THE SANITARYFR1 VALVE 1 1 4 DRAIN TUBE SUPPLIEDWITHFTN 1 1 2 DRAIN TUBE SUPPLIEDBYINSTALLER Detail A LEGEND A ACCESS PANEL AIR GAP ASSY SUPPLIEDWITHVALVE FIG 2 ...

Страница 9: ...sert the 1 4 O D tube Label E into the 1 4 union provided with valve assembly Insert the 1 4 O D water line coming from the fountain into union Trim any excess length Step 4 Insert the 1 4 O D tube Label G into the air gap assembly Step 5 Secure the 1 4 O D tube Label H to the waste line assembly This line is a vent line and should be open to the air LABEL A ON OFF CONTROL LINE FOR BUBBLER ONE LAB...

Страница 10: ...PAGE 10 97738C Rev D 4 04 4715FR FTN Detail B 13 15 2 14 5 3 11 4 12 5 6 6 5 13 15 10 See Detail B FIG 4 FIG 5 Stream Height Adjustment ...

Страница 11: ... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 NS PARTNO Hex Nut 3 8 16 Single Valve Regulator Holder Regulator Nut Poly Tubing 1 4 Cut To Length To Bubbler Poly Tubing 1 8 Cut To Length To Actuator Canister Trap Adaptor 1 1 2 x 1 1 4 Air Gap Assy Fitting 1 2 Union w Strainer Regulator Fitting Elbow 1 4 Stem x 1 4 Tube Fitting Connector 1 4 x 1 4 NPTF Fitting Elbow 1 4 x 1 4 NPTF Fitting Adaptor 1 4 N...

Страница 12: ...alve Make sure the air tubing compression nut is hand tight Disconnect air tube from push button Place finger over air outlet Push button to test diaphragm Tighten diaphragm cap screws Replace diaphragm if necessary Continued Insufficient or Varied Height of Bubbler Flow Replace flow control Check for kinks in the tubing Remove the cleanout plug from the PVC column Remove the valve assembly from t...

Отзывы: