background image

Revised 10-13-2022

Height:  11’ 6” (3.51 m)

14’-1-1/2”

[4.305 M]

16’

[4.877 M]

4.9m x 4.3m (16’ x 14.1’) TIMBER FRAME

 

PAVILION

Installa  on and Opera  ng Instruc  ons – YM12904

Y40000-904

Yardistry – North America

Toll Free Customer Support: 

1.888.509.4382

[email protected]

www.yardistrystructures.com

Regular Hours:  Mon - Fri, 8:30 am - 5:00 

pm EST (excl. holidays)

(For extended hours see our website)                   

English and French Spoken

Patents Pending

IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY

Summary of Contents for YM12904

Page 1: ...nstruc ons YM12904 Y40000 904 Yardistry North America Toll Free Customer Support 1 888 509 4382 info yardistrystructures com www yardistrystructures com Regular Hours Mon Fri 8 30 am 5 00 pm EST excl holidays For extended hours see our website English and French Spoken Patents Pending IMPORTANT RETAIN FOR FUTURE REFERENCE READ CAREFULLY ...

Page 2: ...avoid injury from possible sharp edges of individual elements before assembly During installation follow all safety warnings provided with your tools and use OSHA approved safety glasses Some structures may require two or more people to install safely Check for underground utilities before digging or driving stakes into the ground During assembly it is important to closely follow the instructions ...

Page 3: ...3 support yardistrystructures com ...

Page 4: ...Square Ratchet Claw Hammer Check that assembly is square before tightening bolts Your Yardistry structure is designed and constructed of quality materials As with all outdoor products it will weather and wear To maximize the enjoyment safety and life of your structure it is important that you the owner properly maintain it HARDWARE Check metal parts for rust If found sand and repaint using a non l...

Page 5: ...mbling the beams keep parts flat straight and snug when connecting METAL PARTS Roofing material may have sharp edges wear safety gloves Remove all plastic covering on both sides of the metal panels directly before installing each piece Place roofing material on a non abrasive surface before and after assembly as it can bend dent and scratch easily The roofing screws can easily crush the roof panels an...

Page 6: ...nting to concrete footers see below for the correct locations and placement Please double check for possibility of any underground utilities such as gas telephone cable or sprinkler lines Following are some examples of how to mount the structure to wood or concrete surfaces Refer to your local building and city codes ordinances neighbourhood covenants or height restrictions regarding this type of ...

Page 7: ... 2 x 15 1 2 with 15 24cm 6 clearance on all sides Anchoring Hardware not included Anchoring Hardware not included Anchoring Hardware not included Post Mount Post Mounts have a 12 7mm 1 2 diameter hole for anchoring hardware Concrete Patio 4 483m x 4 585m 14 8 1 2 x 15 1 2 with 15 24cm 6 clearance on all sides ...

Page 8: ...8 support yardistrystructures com ...

Page 9: ...9 support yardistrystructures com ...

Page 10: ...10 support yardistrystructures com ...

Page 11: ...11 support yardistrystructures com ...

Page 12: ...12 support yardistrystructures com Y70841 610 Y00441 611 Y70841 607 Y00441 612 ...

Page 13: ...tion where you plan to install the structure Also check for gas telephone other utilities or sprinkler line locations prior to excavating any holes D Before you discard your cartons fill out the form below The carton I D stamp is located on the end of each carton Please retain this information for future reference You will need this information if you contact the Consumer Relations Department Each ...

Page 14: ...st place one 1465 Plinth on each post side and attach with four 8 x 2 1 2 Wood Screws per plinth Rounded edges on top F2 1 F2 2 and F2 3 D Repeat for three additional Post Assemblies Step 2 Post Assemblies Wood Parts F2 1 4 x 1474 9 x 9 Post 16 x 1465 Plinth Bottom 8 x 2 1 2 Wood Screws x 2 per Post Mount from outside 8 x 2 1 2 Wood Screws x 4 per Plinth Post Post Mount F2 2 F2 3 Rounded Edge on T...

Page 15: ...o 1483 Inner Short Beams and one 1486 Inner Centre Beam at back using twelve 5 16 x 3 1 4 Hex Bolts with 5 16 lock washer 5 16 flat washer and 5 16 t nut as shown in F3 1 F3 2 and F3 3 Make sure all holes align then tighten all bolts Long Beam Insert 5 16 Flat Washer 5 16 Lock Washer 5 16 x 3 1 4 Hex Bolt F3 1 F3 2 1489 Outer Beam FB 1486 Inner Centre Beam 1483 Inner Short Beam 1483 Inner Short Bea...

Page 16: ...bly Part 2 B Install Long Beam Insert on Front Back Beam Assembly using 12 8 x 1 Pan Screws as shown in F3 4 and F3 5 Hardware 24x 8 x 1 Pan Screws F3 4 F3 5 8 x 1 Pan Screws x12 Front Back Beam Assembly Make sure bolt heads are on the outside of each Beam Assembly ...

Page 17: ...6 Inner Centre Beam F3 6 F3 7 and F3 8 D Repeat for a second Front Back Beam Assembly Hardware 60 x 8 x 2 1 2 Wood Screw Step 3 Front Back Beam Assembly Part 3 F3 6 F3 7 8 x 2 1 2 Wood Screws x 30 5 16 T nut Beam Insert Side F3 8 Beam Insert is on this side of assembly Wood Screw Side Notice T Nuts on this side 1486 Inner Centre Beam 1483 Inner Short Beam 1483 Inner Short Beam ...

Page 18: ... large washer and 5 16 t nut as shown in F4 1 and F4 2 Hardware Wood Parts 4 x 1462 Beam Bottom End 2 x 1459 Beam Top RT 2 x 1460 Beam Top LT 2 x 1461 Beam Bottom Centre 12 x 5 16 x 1 Hex Bolts 5 16 T Nut 5 16 Lock Washer 1 4 5 16 Large Washer 1459 Beam Top RT 5 16 T nut Step 4 Side Beam Assembly Part 1 1 4 5 16 Large Washer 5 16 Lock Washer 5 16 x 1 Hex Bolt F4 1 1460 Beam Top LT 1461 Beam Bottto...

Page 19: ...Block 24 at the centre of the 1498 Beam Back Centre It should measure 27 1 2 to the end of each 1472 Beam Block 17 This will verify central position F4 5 and F4 6 Hardware Wood Parts 4 x 1471 Beam Block 9 2 x 1495 Beam Back Centre 4 x 1472 Beam Block 17 4 x 1498 Beam Back End 2 x 1473 Beam Block 24 Step 4 Side Beam Assembly Part 2 27 1471 Beam Block 9 F4 5 1471 Beam Block 9 1472 Beam Block 17 1473...

Page 20: ...ts at the centre These bolts temporarily secure the beam assembly ends for when Beam Top Assembly is fastened F4 8 F4 9 and F4 10 Wood Parts 4 x 1501 Beam Front Step 4 Side Beam Assembly Part 3 F4 7 F4 9 1471 Beam Block 9 1471 Beam Block 9 1472 Beam Block 17 1473 Beam Block 24 1472 Beam Block 17 1501 Beam Front 1501 Beam Front Side Beam Insert Hardware Components 2 x Side Beam Insert F4 8 1471 Bea...

Page 21: ...End H Connect Beam Assemblies Beam Blocks and Beam Insert together with eight 5 16 x 5 3 4 Hex Bolts with 5 16 lock washer and 5 16 flat washer The 5 16 t nut has been previously installed in Part 2 of this Step F4 11 and F4 12 Keep bolts loose 5 16 x 5 3 4 Hex Bolt x8 16 x 5 16 x 5 3 4 Hex Bolt 5 16 lock washer 5 16 flat washer 5 16 t nuts have been previously installed Beam Block F4 12 ...

Page 22: ...place the Beam Top assembly from Part 1 so the groove sits tight and flush with the beam assembly then fasten with 26 8 x 2 1 2 Wood Screws F4 13 and F4 14 Step 4 Side Beam Assembly Part 5 F4 13 8 x 2 1 2 Wood Screws x26 Hardware 52 x 8 x 2 1 2 Wood Screws Beam Top Assembly Part 1 of this Step Tight to grooves Flush ...

Page 23: ... End 48 x 8 x 1 Pan Screws 32 x 8 x 2 1 2 Wood Screws J Flip the assembly over and place Beam Bottom Assembly from Part 1 so the groove sits tight and flush to the beam assemblies and fasten with 16 8 x 2 1 2 Wood Screws F4 15 and F4 16 Remove the 3 8 bolts from each end of this assembly K Fasten Side Beam Insert to the beam with 24 8 x 1 Pan Screws F4 15 and F4 16 Before continuing onto the next s...

Page 24: ...m Assembly with one 5 16 x 3 Lag Screw with 5 16 flat washer F4 17 and F4 18 M Repeat Steps A L for a second Side Beam Assembly Step 4 Side Beam Assembly Part 7 F4 17 F4 18 Hardware 2 x 5 16 x 3 Lag Screw 5 16 Flat Washer 5 16 x 3 Lag Screw 5 16 Flat Washer Side Beam Insert ...

Page 25: ...ne Post to the outside of the second Post should be 13 8 1 2 4 178 m F5 1 F5 2 and F5 3 B Repeat with the other Side Beam Assembly connection to Post Assembies Step 5 Frame Assembly and Anchoring Part 1 Hardware 12 x 3 8 x 9 1 2 Hex Bolt 3 8 large washer x 2 3 8 lock nut F5 1 F5 2 F5 3 Post Assembly is flush to Side Beam Assembly 3 8 Large Washer 3 8 x 9 1 2 Hex Bolt 3 8 Large Washer 3 8 Lock Nut N...

Page 26: ... per Gusset F5 4 F5 5 and F5 6 Step 5 Frame Assembly and Anchoring Part 2 Hardware 8 x 5 16 x 4 3 4 Lag Screw 5 16 flat washer 16 x 8 x 3 1 2 Wood Screw F5 5 Side Beam Assembly 5 16 x4 3 4 Lag Screw 8 x 3 1 2 Wood Screw 5 16 Flat Washer F5 4 5 16 x 4 3 4 Lag Screw Post Assembly 8 x 3 1 2 Wood Screw 5 16 Flat Washer 5 16 Flat Washer 5 16 x 4 3 4 Lag Screw 8 x 3 1 2 Wood Screw 1468 Gusset Side 1468 G...

Page 27: ......

Page 28: ...at surface Please refer to pages 6 and 7 for installation examples Any hardware or extra materials for mounting will have to be purchased in advance Hardware 8 x 5 16 x 3 Lag Screw 1 4 5 16 large washer 8 x 5 16 x 4 Hex Bolt 5 16 flat washer 5 16 lock washer 5 16 T Nut 5 16 x 3 Lag Screw F5 10 Inside View Step 5 Frame Assembly and Anchoring Part 4 Front Beam Assembly 5 16 Flat Washer 1 4 5 16 Large...

Page 29: ...Large Washers pre drill with 1 8 drill bit and fasten Front Beam Assembly to each Side Beam Assembly end F5 13 and F5 14 F5 13 F5 14 Hardware 8 x 5 16 x 4 3 4 Lag Screw 1 4 5 16 Large washer 5 16 x 4 3 4 Lag Screw 1 4 5 16 Large Washer Side Beam Assembly Front Beam Assembly Pre drill with 1 8 3mm drill bit prior to fastening ...

Page 30: ...e Vertical 5 16 Flat Washer 5 16 Lock Nut 5 16 Flat Washer A Using 5 16 x 1 3 4 Hex Bolts with two 5 16 Flat Washers and 5 16 Lock Nut connect two Truss Tie Mount Tops to the Truss Tie Vertical The Tie Mount flanges must run flat to each other and parallel to the top of Truss Tie Vertical F6 1 F6 2 F6 3 and F6 4 Note The hole parttern is diiferent at the top of the Truss Tie Vertical F6 3 and F6 4 2...

Page 31: ... with two 5 16 Flat Washers and 5 16 Lock Nut connect the Truss Tie Vertical to the Truss Tie Centre Gusset using the upper holes F6 5 and F6 7 Hardware 6 x 5 16 x 1 3 4 Hex Bolt 2x 5 16 Flat washer 5 16 Lock nut F6 5 F6 6 F6 7 Flange face down Flange face down Flanges inward 5 16 x 1 3 4 Hex Bolt x6 5 16 Flat Washer 5 16 Lock Nut 5 16 Flat Washer Horizontal Truss Assembly Truss Tie Vertical Truss...

Page 32: ...ck Nut connect Truss Tie Assembly to each Side Beam at the centre F6 8 and F6 9 Note The centre of the Truss Tie Assembly projects upward F6 8 Hardware 4 x 5 16 x 6 1 4 Hex Bolt 2x 5 16 Flat washer 5 16 Lock nut F6 8 F6 9 5 16 x 6 1 4 Hex Bolt 5 16 Flat Washer 5 16 Lock Nut Truss Tie Assembly projects up 5 16 Flat Washer x 2 Side Beam Assembly ...

Page 33: ... Flat Washers 5 16 Lock washer 5 16 T Nut per Upright Assembly F7 1 and F7 2 B From inside of the pavilion fasten with 9 8 x 3 Wood Screws per Upright Assembly F7 1 and F7 2 2 x 1463 Upright Back 2 x 1504 Front Upright Wood Parts Hardware 18 x 8 x 3 Wood Screw 8 x 5 16 x 6 1 2 Hex Bolt 1 4 5 16 Large Washer 5 16 Lock washer 5 16 T Nut F7 1 Outside View F7 3 1504 Front Upright 8 x 3 Wood Screw Upri...

Page 34: ...ers with two 8 x 2 1 2 Wood Screws per board F8 2 Repeat steps A C for another Left Roof Panel Step 8 Frame Left Roof Panel Part 1 F8 1 F8 2 Hardware Wood Parts 2 x 1453 Top Rafter 2 x 1456 Centre Rafter 10 x 1457 Common Rafter 2 x 1452 Bottom Rafter 48 x 8 x 2 1 2 Wood Screw 1452 Bottom Rafter 1456 Centre Rafter Flush Notice screws are at an angle F8 3 8 x 2 1 2 Wood Screws x 12 8 x 2 1 2 Wood Sc...

Page 35: ...f the Rafters with two 8 x 2 1 2 Wood Screws per board F8 5 Repeat steps D F for another Right Roof Panel Step 8 Frame Right Roof Panel Part 2 F8 4 F8 5 Hardware Wood Parts 2 x 1453 Top Rafter 2 x 1456 Centre Rafter 10 x 1457 Common Rafter 2 x 1452 Bottom Rafter 48 x 8 x 2 1 2 Wood Screw 1456 Centre Rafter Flush Notice screws at an angle F8 6 8 x 2 1 2 Wood Screws x 12 8 x 2 1 2 Wood Screws x 12 S...

Page 36: ... 4 Hex Bolts 2x 1 4 5 16 Large Washers 1 4 Lock nut on one Right Roof Panel and both Left Roof Panels F8 10 and F8 11 I At this point make sure the assembly is square F8 9 Step 8 Frame Roof Panel Part 3 F8 9 1452 Bottom Rafter F8 8 8 x 1 1 2 Wood Screws x 36 12 x 1455 Strap 144 x 8 x 1 1 2 Wood Screw 543 Strap Long 1455 Strap 10 11 3 340 m F8 10 F8 11 1452 Bottom Rafter Top View 12 x 1 4 x 2 1 4 H...

Page 37: ...16 L Evenly space two 1454 Ridge Long in between 1458 Ridge Short and attach with 8 8 x 2 1 2 Woods Screws F8 13 and F8 15 Step 8 Frame Roof Panel Part 4 F8 15 1454 Ridge Long F8 14 8 x 2 1 2 Wood Screws x 6 8 x 2 1 2 Wood Screws x 20 4 x 1458 Ridge Short 4 x 1454 Ridge Long 40 x 8 x 2 1 2 Wood Screw 6 x 1 4 x 5 Hex Bolt used only for placement purposes 1458 Ridge Short Note install is for one Rig...

Page 38: ...ly as it can bend dent and scratch easily WARNING DO NOT OVER TIGHTEN ROOFING SCREWS Over tightening screws will cause roofing material to crush The roofing screws can easily crush the Roof Panels and Roof Edges when using a power drill We recommend hand tightening the roofing screws so that they sit snug and tight to the roofing material STOP STOP STOP STOP Overtightened and Crushed Snug and Tight X ...

Page 39: ...sharp edges Wear gloves BE SURE TO REMOVE ALL PLASTIC COVERING ON BOTH SIDES OF THE ALUMINUM PANELS AND TRIM DIRECTLY BEFORE INSTALLING EACH PIECE One side is clear and the other is blue both must be removed STOP STOP STOP STOP Overtightened and Crushed Snug and Tight Example 1 Example 2 Example 3 ...

Page 40: ...d F9 3 B Place another Panel beside the first so the panels overlap and screw holes line up as shown below F9 1 and F9 4 C Attach both Panels to Roof Panel Frame using twelve 8 x 1 Hex Roofing Screws in locations shown in F9 1 D Repeat Steps A C for the remaining Roof Panel Frames 48 x 8 x 1 Hex Roofing Screw Roof Parts 8 x Roof Panel DO NOT overtighten screws could cause damage to roofing material Ro...

Page 41: ...to overtighten screws F Continue to attach Panels to Roof Panel Frame using 32 8 x 1 Hex Roofing Screws Be sure not to overtighten screws F9 6 G Repeat Steps E F for the remaining Roof Panel Frames F9 6 F9 5 Components 4x Roof Edge Step 9 Attach Roof Panels Part 2 8 x 1 Hex Roofing Screws 11 per Panel Frame Hardware 172 x 8 x 1 Hex Roofing Screw Roof Edge Pre drill for these 2 screws 1452 Bottom Raft...

Page 42: ...e Roof Panels F9 7 F9 8 F9 9 and F9 10 Note Ridge Clips only attach to each 1456 Centre Rafter I Repeat for remaining Roof Panel Frames F9 7 Components 4 x Ridge Clip 4 x Weather Seal Hardware 20 x 7 x 3 4 Wood Screw F9 8 F9 9 7x 3 4 Wood Screws 5 per Panel Frame Ridge Clip 1456 Centre Rafter notice holes in board F9 10 2 3 4 6 99cm Ridge Clip 1452 Bottom Rafter 7x 3 4 Wood Screws 5 per Panel Fram...

Page 43: ...entre Truss Assembly making sure Panel Frames are tight together and notches are tight to Side Beam Assemblies One assembler must remain on a ladder to hold Roof Panel Frame in place until secured F10 1 F10 2 and F10 3 Step 10 Attach Roof Panels to Frame Part 1 F10 1 Right Roof Panel Frame with Roof Ridges F10 2 Notch rests on Side Beam Assembly One assembler to support Roof Panel Frames at all ti...

Page 44: ...3 Rafter Top with six 1 4 x 5 Hex Bolts with two 1 4 5 16 large washer and one 1 4 lock nut Loosely attach hardware Tightening will occur at a later step F10 4 and F10 5 F10 5 F10 4 x 3 Hardware 6 x 1 4 x 5 Hex Bolt 1 4 5 16 large washer x 2 1 4 lock nut 1 4 Lock Nut Section of Roof Panel removed for Clarity 1458 Ridge Short 1 4 5 16 Large Washer 1454 Ridge Long The 1456 Centre Rafter of each pane...

Page 45: ...e 5 16 x 4 Hex Bolt two 1 4 5 16 large washer and one 5 16 lock nut Loosely attach hardware Tightening will occur at a later step F10 6 and F10 8 F10 8 x 3 Hardware 3 x 5 16 x 3 3 4 Hex Bolt 1 4 5 16 large washer x 2 5 16 lock nut 1 x 5 16 x 4 Hex Bolt 1 4 5 16 large washer x 2 5 16 lock nut Components 1 x Centre Rafter Bracket F10 7 F10 6 5 16 Lock Nut Note Centre Rafter Bracket is centred over T...

Page 46: ...g Clip holds the assembly together F10 10 F10 11 and F10 12 H With one person on each end of the roof place Peak Cap Assembly on top Panel Roof Frame Assemblies so Carriage bolts with Peak Post fit through gaps between the roof assemblies F10 13 1 4 Lock Nut 1 4 x 1 2 Pan Bolt Peak Cap Peak Cap Link Carriage Bolt Contoured Washer Peak Cap Peak Cap Assembly Hardware 6 x Carriage Bolt spring clip con...

Page 47: ...Frame together through the 1453 Rafter Top with six 1 4 x 5 Hex Bolts with two 1 4 5 16 large washer and one 1 4 lock nut Loosely attach hardware Tightening will occur at a later step F10 14 and F10 17 F10 15 F10 16 Hardware 3 x 5 16 x 3 3 4 Hex Bolt 1 4 5 16 large washer x 2 5 16 lock nut 6 x 1 4 x 5 Hex Bolt 1 4 5 16 large washer x 2 1 4 lock nut Step 10 Attach Roof Panels to Frame Part 5 x 3 5 ...

Page 48: ...x 4 Hex Bolt 1 4 5 16 large washer x 2 5 16 lock nut 4 x 1 4 x 2 1 4 Hex Bolt 1 4 5 16 large washer x 2 1 4 lock nut Step 10 Attach Roof Panels to Frame Part 6 x 3 1 x Centre Rafter Bracket 4 x Rafter Bracket Long Flush and Tight Rafter F10 19 Inside View Upright Assembly 5 16 Lock Nut 5 16 x 4 Hex Bolt 1456 Centre Rafter 1 4 5 16 Large Washer 1 4 5 16 Large Washer Centre Rafter Bracket Front Beam...

Page 49: ...1 4 Pan Screws per Centre Rafter Bracket F10 21 F10 22 and F10 23 Once screws are installed tighten all bolts in Rafter Brackets and Roof Panels F10 21 F10 22 Hardware 76 x 10 x 1 1 4 Pan Screw Step 10 Attach Roof Panels to Frame Part 7 x 3 10 x 1 1 4 Pan Screw x4 per bracket Side Beam Assembly F10 23 Centre Rafter Bracket 1456 Centre Rafter 1456 Centre Rafter Inside View Inside View 10 x 1 1 4 Pa...

Page 50: ... Edge where each Roof Panel Frame Assembly connect F11 1 and F11 2 B Place one Centre Roof Edge over each connecting seam tight to Roof Edges and attach with previously removed screws F11 1 and F11 3 Remove these screws Ridge Clip Reattach screws here Tight Roof Edge Ridge Clip Roof Edge Components 2 x Centre Roof Edge Centre Roof Edge ...

Page 51: ...e one Ridge Cap over the Ridge Clips from the bottom up to the top with holes in Ridge Cap towards bottom Slide under Peak Cap Assembly Attach with two 8 x 3 4 Sheet Metal Screws per Ridge Cap Middle F11 4 F11 5 F11 6 and F11 7 8 x 3 4 Sheet Metal Screw Note To help Ridge Caps slide on easier use a lubricant such as liquid soap F11 6 Ridge Cap Hardware 4 x 8 x 3 4 Sheet Metal Screw ...

Page 52: ...oose and will fall out until attached to Carriage Bolt F12 2 and F12 3 B Place one Peak Bracket over each of the carriage bolts then attach Peak Loop to the carriage bolt and twist to tighten F12 1 F12 2 and F12 3 C Attach Truss Tie Mount Top to 1453 Rafter Tops at centre location with four 12 x 1 1 2 Pan Screws F12 1 and F12 4 1 4 Nut Peak Loop Peak Bracket Carriage Bolt Inside View Inside View 1...

Page 53: ... 99cm all along each 1464 Fascia Attach with eleven 8 x 1 3 4 Wood Screws per 1464 Fascia F13 3 F13 4 and F13 5 C Repeat for the other side of the assembly F13 1 Flush and Tight Hardware Step 13 Attach Fascia F13 2 Wood Parts 4 x 1464 Fascia 2 x 1492 Roof Peak 8 x 1 3 4 Wood Screws 11 per Fascia 2 3 4 6 99cm x 2 Rafter 1492 Roof Peak 1464 Fascia 8 x 5 16 x 1 3 4 Hex Bolt 1 4 5 16 large washer 5 16...

Page 54: ...l bit and attach with 5 16 x 3 Lag Screws 5 16 Flat Washer F14 1 and F14 2 C Repeat for other side of assembly F14 1 Flush and Tight Hardware 8 x 8 x 2 1 4 Wood Screw 4 x 5 16 x 3 Lag Screw 5 16 Flat Washer Step 14 Attach Gable Gussets F14 2 Wood Parts 2 x 1466 Left Gable Gusset 2 x 1467 Right Gable Gusset 8 x 2 1 4 Wood Screws 2 per Gusset x 2 1466 Left Gable Gusset 8 x 2 1 4 Wood Screws 2 per Gu...

Page 55: ...parts for this specific model F15 1 and F15 2 B Two 50 mm Hooks are included with this unit for attaching wiring They can be placed anywhere along the Rafters as needed Pre drill with a 1 8 drill bit before installing F15 3 Hardware 2 x 8 x 1 Pan Screw F15 1 F15 2 8 x 1 Pan Screw Gazebo ID Plaque Components 1 x Gazebo ID Plaque 2 x 50mm Hooks F15 3 Note We have provided two 50 mm hooks for optional...

Page 56: ...56 support yardistrystructures com ...

Page 57: ...57 support yardistrystructures com NOTES ...

Page 58: ...Hours Heures Horas 8 30 am 5 00 pm EST excl holidays hors jours fériés excepto los días fes vos English and French Spoken Anglais et français parlés Inglés y francés hablado ...

Reviews: