4420DBFR_FTN _A    LK4420DBFR_FTN_A

1000003947    (Rev. A - 06/17)

INSTALLATION INSTRUCTIONS FOR INSTALLING SANITARY FREEZE

TRIPLE VALVE CONTROL ASSY.

1. Prepare trench for water supply and waste drain lines (if required by local codes).  The hole should be deep enough to accommodate the PVC column and 5 cubic feet 

  of porous fill (large broken rock).  Additional porous fill may be required due to local ground conditions. (See Site Preparation Detail below).

2. Lay drain lines and water supply lines. Provide service shut off valve for maintenance. Flush the water supply line before attaching to the shut off valve.

3. Set PVC column in excavating pit.  Connect the water supply line to the inlet on the PVC column.  Remove valve assembly from the PVC column by carefully 

  pulling up on the nylon strap.  Pressure test the valve assembly for leaks.  Check operation of the water valve by blowing on the small clear diameter tubing.

  A steady stream of water should flow from the braided tubing.  After releasing air pressure from the small clear tubing the water stream should stop.

4. Replace the water valve into the PVC column.  Make sure the supply hose coils into the bottom of the PVC column without any kinks. Cap the PVC column, protect 

  the ends of the connecting tubes and backfill the trench.  Keep the PVC column vertical at all times.

5. Form the concrete mounting pad and locate the fountain 3/8" minimum fasteners (not included) in the proper position.  (Refer to Rough-in for correct location of 

  fasteners.)  (Fasteners not included). Pour concrete and finish.  Be sure to keep concrete away from the top of the PVC column to allow removal of PVC cap to allow 

  for future service.  Let concrete set 4 hours minimum before mounting fountain.

6. Double check that the water valve is positioned fully at the bottom of the PVC column.  Install insulation into the PVC column and push down onto the top of the 

  water valve.

7. Mount the fountain onto the 3/8" minimum fasteners. (Fasteners not included). Level and shim fountain as required.

8. Connect the drain line, water line and air control lines. Excess lengths should be trimmed from the tubing. The water supply line must be positioned for positive 

  drain back out of the fountain and down through the water valve.  

Any water allowed to be trapped above the frost line will freeze leaving the unit inoperable.

  

  Do not pull up on the connection lines as this could raise the valve above the frost line.

9. Check for proper operation by using fountain push buttons.  If the valve does not work properly check for leaks or kinks in the air control line.

10. After insuring proper operation reassemble fountain. Installation of your fountain is now complete.

IMPORTANT! INSTALLER PLEASE NOTE

* For freeze resistant valve to function properly, the valve must be installed in a non-freezing area or below frost line.

* Tubing must be cut to right length. Do not coil any excess tubing or it will cause the valve to malfunction.

* Do not pull up on lines coming out of the PVC column. This raises the water valve above the frost line. Use the nylon strap (ref. Item 10) to lift the unit to prevent damage  

  to the valve.

General Installation Tips

1. Be sure to flush water supply line before you connect it to the inlet fitting on Freeze Resistant Valve System.

2. There is one combined drain line required for this unit that is for the drinking fountain basin and/or bottle filler drains and the valve/water supply line system. The bowl

  drain is the 1-1/2" PVC fitting at the bottom of the 8" PVC tube and the valve drains back up to the bowl drain through the air gap assembly (provided). Provide

  ample drainage. It's always better to have too much than not enough.

3. The column (8" PVC tube) must remain vertical. Be sure it remains vertical when backfilling the excavating trench.

4. When the concrete pad, for mounting the fountain is poured, be sure to allow adequate space around the top of the column for servicing the valve.

5. We recommend that the top of the column be flush or slightly above the top height of the concrete pad.

6. You should test the unit before you backfill. Simply blow on the clear, small diameter tubing. A steady stream should flow from the braided tubing line. When air

  pressure is removed from the clear tubing the water stream should stop.

7. Once you have tested the valve, backfilled the hole and poured the concrete mounting pad you are ready to set the fountain. After bolting the fountain in place

  connect the air control valve tubing, supply water tubing and drain lines. The water supply line must have a straight run from the basin bubbler down to the control

  valve. If a straight run is not maintained water will become trapped and freeze leaving the unit inoperable. Test the fountain again. If it fails to work, the air control

  line may be kinked or connected improperly. Be sure to keep water out of the air control line.

8. These products are designed to operate on 20 PSI to 105 PSI supply line pressure. If inlet pressure above 105 PSI, a pressure regulator must be installed in the

  supply line. Any damage caused by reason of connecting this product to supply line pressure lower than 20 PSI or higher than 105 PSI is not covered by warranty.

INSTALLATION INSTRUCTIONS

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

IMPORTANT! INSTALLER PLEASE NOTE.

THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES 

IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE 

BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN 

ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE 

WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN 

FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE 

FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.

Содержание 4420DBFR FTN A Series

Страница 1: ...lve Control Assembly 4420DBFR Fountains are among the easiest to install Fountains on the market today To assure you install these models easily and correctly PLEASE READ THESE SIMPLE INSTRUCTIONS BEF...

Страница 2: ...t be cut to right length Do not coil any excess tubing or it will cause the valve to malfunction Do not pull up on lines coming out of the PVC column This raises the water valve above the frost line U...

Страница 3: ...8 INCH INSIDE DIA PVC PIPE TRIM TO DESIRED LENGTH SUPPLIED BY INSTALLER PVC 8 x 8 x 4 COMBINATION Y 1 8 BEND REDUCING ASSY SUPPLIED BY INSTALLER 4 PVC PIPE SUPPLIED BY INSTALLER 4 102mm 4 PVC 1 4 BEND...

Страница 4: ...R AS REQUIRED BY LOCAL CODES A SEE DETAIL A 36 MIN 914mm 60 MAX 1524mm FROST LINE 27 1 8 689mm 19 483mm O 14 356mm 2 PL 10 254mm O 29 737mm 22 559mm 8 203mm 41 7 16 1053mm 34 9 16 878mm FIG 2 SUGGESTE...

Страница 5: ...Labeled E F L into the 1 4 union s provided with valve assembly Insert the 1 4 O D water lines coming from the fountain s into union s Trim any excess length Step 4 Insert the 1 4 O D tube Labeled G i...

Страница 6: ...PAGE 6 4420DBFR_FTN _A LK4420DBFR_FTN_A 1000003947 Rev A 06 17 DETAIL B 6 3 4 12 14 7 SEE DETAIL B 8 Stream Height Adjustment 8 FIG 4 8 8 15 8 8 7 8 2 16 5 13 8...

Страница 7: ...PART NO Hex Nut 3 8 16 Bracket Regulator Mtg Serv Hex Nut 1 5 16 Triple Valve Regulator Holder Regulator Nut Poly Tubing 1 4 Cut To Length Poly Tubing 1 8 Cut To Length Canister Nylon Strap 6 ft Kit...

Страница 8: ...PAGE 8 4420DBFR_FTN _A LK4420DBFR_FTN_A 1000003947 Rev A 06 17 FIG 7 Included with Sanitary Valve 18 22 27 29 24 30 30a 30b 22 31 21 32 33 22 22 18 32 27 28 19 18 23 25 26 20 29 34...

Страница 9: ...ated below frost line in bushing between barb fitting and valve No Flow Check for leaks in the air tubing going from the push button to the valve Make sure the air tubing compression nut is hand tight...

Отзывы: