MAN2285-9
Page 24
7.1.5
Connecting ancillary cables
Cable Gland
Cable Screen
Ferrite
Connect cabling
to " FIRE "
FIRE FAULT
Cabling
Plug
Note:
For the system to meet full EMC compliance requirements ensure the wiring to the “FIRE“ terminals
is looped through the supplied ferrite ring.
7.2
Final installation
7.2.1
Connecting ancillary cables
Once the power and signal connections are made slide the detector body up into the docking station and fasten
it into position using the two M4 pan head screws provided. Slot the power and signal terminal blocks into t he
relevant sockets on the detector PCB (they will only click fully home in the correct orientation) and replace the
detector cover using the four M3 pan head screws provided.
Note:
The detector is designed solely for operation with the front cover securely fitted using all four fixing
screws.
Removing the detector is simply the reverse of this process, leaving the pipe-work and wiring connections
installed in the docking station.