background image

4

1

2

3

Get Started:

This box includes:

• Alicat device

• NIST traceable calibration certificate 

• Optional accessories

 

(cables, power adapters, filters)

Power

The power supply 

input is on top. Most 

devices require 

12–24Vdc and 40mA. 

See 

Power and Signal 

Connections

 in the 

manual for details.

You’re Ready to Connect:

Units 

Ensure the proper 

units are selected. 

Press the button next 

to the parameter you 

want to change on the 

main screen, then 

SET 

DEVICE ENG UNITS

5⁄64

″ 8-32 Nylon-tipped

  hex bleed screw

 Loosen to bleed

DO NOT REMOVE

Connect the device to your process, and start the 

flow of water. To remove air bubbles: 

  (a) start the flow of liquid, 

  (b) gently loosen the upstream bleed port screw, 

    but stop when pressure forces liquid to leak, 

  (c) tap the flow body.

Do not use bleed ports if the device is inverted.

Ensure the flow path is the same direction as the 

flow arrow shown on your unit. For applications 

that may continuously introduce air bubbles, 

the device may be mounted upside-down.  

DOC-MANUAL-L-QUICK-EU 

Rev 0 • 2020-07-28

Tare

Before installing 

the device into your 

process, press the 

TARE FLOW

 button 

on the main screen. 

This will zero out 

(tare) your unit.

5

Download the full manual: 

Alicat.com/manuals

Annual Calibration • Troubleshooting • Questions:

 

+31 (0) 26 203.1651 • [email protected]

Download the full manual: 

Alicat.com/manuals

Annual Calibration • Troubleshooting • Questions:

 

+31 (0) 26 203.1651 • [email protected]

Отзывы: