background image

 

SPOGG Sport-Güter GmbH 

 Schulstr. 27 

 35614 Aßlar/Berghausen 

[email protected]

 

 www.hally-gally-spielplatzgeraete.de 

 

 

Y:\Mont-anv-2010\Trampolin Circus_002 (2).doc

 

- 5 - 

 

 

Drawings / Views

 

All optical drawings are showing only the measurements/dimensions and 
are no mandatory technical views of the complete item.  
 

We reserve the right to change technical details of our articles which are 
serving for the further development of our articles and are reasonable for 
the customer. 

 

Measurement tolerances

 

Because of the properties and characteristics of the components, minor 
measurement tolerances compared to the indication on the sketches are 
possible. 

This concerns all shown measurements except the foundation 
measurements resp. measurements below upper edge ground level/play 
area. 

Содержание 20.02.112

Страница 1: ...lplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 1 A Assembly instructions Trampoline Circus Art 20 02 112 Operator _____________________________________________________ Location ______________________________________________________ ...

Страница 2: ...tzgeraete de www hally gally spielplatzgeraete de 2 Y Mont anv 2010 Trampolin Circus_002 2 doc Revision history Revision 0 2010 06 18 The first allowed version Assembly instructions JF Revision 2 2013 09 02 Achtung Trennfuge FH All rights reserved Copyright 2010 Spogg Sport Güter GmbH ...

Страница 3: ...cus Art 20 02 112 6 3 Delivery contents parts list with part numbers 7 4 Post installation checks 15 B Maintenance instructions Trampoline Circus Art 20 02 112 17 5 Introduction Maintenance 19 6 General maintenance information 20 7 Maintenance timetable 22 8 Monthly maintenance 23 9 Quarterly maintenance 23 10 Half yearly maintenance 23 11 Annual maintenance 25 12 Maintenance printout 26 13 Hand o...

Страница 4: ...s that may be required can be obtained directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any other questions Following installation complete assembly instructions maintenance instructions and a maintenance record must be sent to the operator who must confirm receipt in writing See the last page of this document All n...

Страница 5: ... views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer Measurement tolerances Because of the properties and characteristics of the components minor measurement tolerances compared to the indication on the sketches are possible This concerns all shown measurements ...

Страница 6: ...s recommended by manufacturer Critical fall height as checked a Appropriate ground material prepared for use at playgrounds b In case of loose fill material 100mm have to be added onto the minimum layer thickness to compensate the falling away effect see 4 2 8 5 1 c Without silty or clayey proportions Grain size can be determined by a sieve test according to EN 933 1 d See note 1 in 4 2 8 5 2 3 Na...

Страница 7: ...y spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 7 3 Delivery contents parts list with part numbers 3 1 In words Table 3 1 Delivery contents in words Pos Quantity Element Description Size O K Missing 1 1 Round trampoline Ø 1 90m 2 4 Foundation ring Ø 1 90m 3 16 Bolts M10x12mm 4 16 Nyloc nuts M10 ...

Страница 8: ...4 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 8 Y Mont anv 2010 Trampolin Circus_002 2 doc Table 3 2 Delivery contents in symbols Pos Quantity Symbol 1 1 Ø 1 90 m 2 1 3 16 M10 x 12 mm 4 16 M10 ...

Страница 9: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 9 ...

Страница 10: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 10 Y Mont anv 2010 Trampolin Circus_002 2 doc ...

Страница 11: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 11 ...

Страница 12: ...SPOGG Sport Güter GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 12 Y Mont anv 2010 Trampolin Circus_002 2 doc ...

Страница 13: ...4 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 13 Attention The split line of 10mm is required to keep the trampoline removeable for maintenance work ...

Страница 14: ...low for working space pit Ø 2 40 m G Drainage layer O K Top ground level PS Place requirement RN In case of using wetpour the cleaning of the outer gaps is mandatory Lift the trampoline with 4 people even out of the ground After cleaning set the trampoline carefully back onto the plasticframe PS Space required including safety zone mE Refill and compact See drawings for details of shortcuts ...

Страница 15: ...fely in the following cases Installation of equipment is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee operational safety 4 3 Removal of all assembly aids Please make sure that all assembly aids have been removed from the playing area The equipment must not be approved for use until this check has been carried out 4 4 Information about...

Страница 16: ......

Страница 17: ...GmbH Schulstr 27 35614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de Y Mont anv 2010 Trampolin Circus_002 2 doc 17 B Maintenance instructions Trampoline Circus Art 20 02 112 ...

Страница 18: ...geraete de www hally gally spielplatzgeraete de 18 Y Mont anv 2010 Trampolin Circus_002 2 doc Revision history Revision 0 2010 06 18 The first allowed version Maiantanance instructions JF Revision 2 2013 09 02 Achtung Trennfuge FH All rights reserved Copyright 2010 Spogg Sport Güter GmbH ...

Страница 19: ...N 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous Any spare parts which may be required can be obtained directly from your supplier This equipment should only be assembled maintained and repaired by persons with the necessary expertise A copy of the inspection record sh...

Страница 20: ...ne of the characteristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or another similar lubricant 6 4 Spare parts All spare parts must conform to the manufacturer s specifications 6 5 Identifying spare parts All spare parts are listed in the parts list The parts list follow...

Страница 21: ...d checks carried out to ensure that there are no missing screws 6 11 Preventing equipment use Use of the equipment should be prevented in the event of incomplete installation disassembly maintenance repairs and faults 6 12 Claims liability for faults steel poles Steel posts and footings are covered by our guarantee if refular maintenance is carried out and recorded in writing Our general terms and...

Страница 22: ... equipment 7 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipment is subject to intensive use 7 1 3 Faults that compromise safety In the event of a fault that compromises safety quick action must be taken This may involve repairing it immediately or shutting down and dismantling the equipment 7 1 4 ...

Страница 23: ...parts sleeves etc for wear and tear or damage and replace if necessary 8 7 If necessary remove excess padding material from the post footings due to danger of rotting 8 8 Check the surface of wooden parts for damage caused by the weather or external influences and mould Repair or replace if necessary 8 9 Check the surface of plastic and metal parts e g slides for damage and replace if necessary 9 ...

Страница 24: ...5614 Aßlar Berghausen spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 24 Y Mont anv 2010 Trampolin Circus_002 2 doc repairs have been carried out or additional system components have been installed or replaced ...

Страница 25: ...surfaces are safe for operation 11 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in order to do so Zinc paint should be applied to corroded areas and scratches The equipment must be inspected by someone with the necessary expertise in strict compliance with the instructions issued with the product A copy of the...

Страница 26: ...________ Location _______________________________________________________________________________________ Customer or operator _____________________________________________________________________________ Town Town council Kindergarten Date of inspection Inspector O K Accessible Barriered Defects Repaired by Date Please copy and return once a year after main inspection has been carried out to the ...

Страница 27: ......

Страница 28: ..._________________________________________________ ______________________________________________________________ Competent person in charge ______________________________________________________________ ______________________________________________________________ Installation company address ______________________________________________________________ __________________________________________...

Отзывы: