2.
Sides
Lay the parts coded in
fig. 4
on the ground. All the illustrations in this section are viewed
from the inside. Join the sill bar (
701/01/33
) to the eaves bar (
843/353/340
) with the
intermediate vertical bars (
201
) – see details
B
and
E
.
IMPORTANT
Remember to slide one bolt into the groove of each intermediate vertical bar that is
crossed by a diagonal brace, in order to fix the centre of that brace, as in
A
.
The parts should be bolted with the square headed aluminium bolts and nuts provided,
but
none of the bolts should be fully tightened until the greenhouse is completely assembled
.
Bolt the two diagonal struts (
194
) over the top, as in
A
,
C
and
D
.
Repeat with the other side.
7
Содержание SILVERLINE 86 LEAN TO
Страница 3: ...1106 No 6 x 16mm self tapping screws 1476 612 1774 5 1839 3...
Страница 6: ...PLEASE NOTE THE GREENHOUSE MAY BE SUPPLIED WITH EITHER SQUARE NUTS OR HEXAGONAL NUTS A B C E D 6...
Страница 8: ...M J H G I K N F L F 8...
Страница 10: ...T U R O S Q P 10 1 x Extra bolt 3 x Extra bolts 1 x Extra bolt 3 x Extra bolts...
Страница 12: ...Plumbline Spirit Level Tanalised timber batten V Y AA BB Z W CC 12...
Страница 17: ...OO BF RR PP INSIDE OUTSIDE OUTSIDE INSIDE 17...
Страница 26: ...26...
Страница 27: ......
Страница 28: ...www hallsgreenhouses com This product is delivered by a company in the Juliana Group www juliana com...