LONG PANE TOUGHENED GLASS
Apart from the door, the glass
and acrylic are
held in with "W" spring clips as with horti.
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w w w
w w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
Remember, glass and plastic are fragile.
HANDLE WITH CARE
using gloves and store upright.
First, fit the glazing strip (
410
). It is easier to insert glazing strip if it is at room temperature.
Starting at the top near the ridge bar, pinch the glazing strip between your forefinger and thumb, push it into the grooves in
the glazing bar as in
AB
(see horticultural glass page)
. Holding the inserted part of the strip with one hand, ease it along
its length taking care not to stretch
it
is as in
AC
and cut to length.
There is no easy way to do this!
ĞĨŽƌĞŐůĂnjŝŶŐƚŚĞƐŝĚĞĂŶĚƌŽŽĨŽĨLJŽƵƌŐƌĞĞŶŚŽƵƐĞ͕ƐƚŝĐŬƚŚĞƐĞůĨͲĂĚŚĞƐŝǀĞĨŽĂŵƐƚƌŝƉ;ϰϮϴͿƚŽƚŚĞƵŶĚĞƌƐŝĚĞŽĨƚŚĞĞĂǀĞƐ
ďĂƌ͕ƌŝĚŐĞďĂƌ͕ĚŽŽƌƚƌĂĐŬĂŶĚƌŽŽĨǀĞŶƚƐŝůůďĂƌĂƐƐŚŽǁŶŝŶ͘^ƚƵĚLJƚŚĞŐůĂnjŝŶŐƉĂƚƚĞƌŶ
below
͘
BEFORE STARTING THE GLAZING, IT IS IMPORTANT TO CHECK THAT THE ROOF BARS ARE SQUARE WITH THE EAVES BARS.
Push the
top
end of the glass as far as possible under the ridge bar and hold it in place with the glazing spring clips (
453
) as
in
AF
.
IT IS RECOMMENDED THAT FLASHING OF SOME TYPE IS FITTED (NOT SUPPLIED) TO THE FULL LENGTH OF THE
RIDGE BAR WITH ABOUT A 60mm OVERHANG EITHER END TO REDUCE POSSIBLE WATER INGRESS as in
AL.
Apply sealant into lip on eaves bar as in
AN
.
Fit plastic "Z" section, part 711 (widest part for glass) to the bottom of the pane, making sure it is pushed as far onto the
glass as it will go.
Take plastic sheet code
K
,
removing protective film from both sides
, and push up into the
Z
section
as
far in as it can go
, underlapping the glass pane above.
T
hen bend the sheet so the bottom edge fits behind the retaining
lip on the top of the eaves bar as in
AI
.
Secure with "W" spring clips.
To finish glazing the greenhouse start from the bottom placing a pane of glass on the sill and fix with spring clips.
Check List
1. Door is sliding smoothly, adjust if necessary.
Roof vent is opening and closing smoothly.
2.
3. Check all nuts and bolts are secure.
4. Check that all the corner joints are sealed, particularly in the roof vent area, and inside corner of sill, eaves and ridge.
25
8
Содержание SILVERLINE 86 LEAN TO
Страница 3: ...1106 No 6 x 16mm self tapping screws 1476 612 1774 5 1839 3...
Страница 6: ...PLEASE NOTE THE GREENHOUSE MAY BE SUPPLIED WITH EITHER SQUARE NUTS OR HEXAGONAL NUTS A B C E D 6...
Страница 8: ...M J H G I K N F L F 8...
Страница 10: ...T U R O S Q P 10 1 x Extra bolt 3 x Extra bolts 1 x Extra bolt 3 x Extra bolts...
Страница 12: ...Plumbline Spirit Level Tanalised timber batten V Y AA BB Z W CC 12...
Страница 17: ...OO BF RR PP INSIDE OUTSIDE OUTSIDE INSIDE 17...
Страница 26: ...26...
Страница 27: ......
Страница 28: ...www hallsgreenhouses com This product is delivered by a company in the Juliana Group www juliana com...