87
2022
Innovative Vehicle Solutions
DIAG++
Operator‘s Guide
DIAG++
EOLT initialisation
A list of EOLT tests are shown. These tests can be
selected or de-selected as required by ticking the
corresponding box.
If the 'Operators name' option is selected, it will enable
a name to be entered in the area below. This will be
recorded on the EOLT report.
If the 'Pause between tests' option is not selected, the
selected tests screen will run automatically after each
test has been carried out.
Click on the ‘Quit’ button to return to return to the
previous dialog.
Click on the ‘Next’ button to start the EOLT.
Note: During the EOLT procedure the cab / trailer
warning lamp will flash to indicate the EOLT is in
progress.
The screen display as shown below is relevant to a
Master 2S / 2M system.
Sensor tests
This full sensor test is optional, as the sensors will also
be tested during the 'Sensor modulator tests'
Procedure:
›
Rotate each wheel through 3 revolutions in 5 secs
›
The test sequence is S1A, S1B, S2A, S2B etc
Result section:
Yellow indicates wheel spinning fast enough.
Green indicates test passed.
Red indicates DTC generated during test.
If previously entered, the vehicle ident number (VIN)
will be displayed in the title bar of each test.
Содержание DIAG++
Страница 1: ...Innovative Vehicle Solutions OPERATOR S GUIDE ...
Страница 4: ...4 Innovative Vehicle Solutions 2016 4 Innovative Vehicle Solutions 2022 Operator s Guide DIAG ...
Страница 14: ...14 Innovative Vehicle Solutions 2016 14 Innovative Vehicle Solutions 2022 Operator s Guide DIAG ...
Страница 97: ...97 2022 Innovative Vehicle Solutions DIAG Operator s Guide DIAG Notes ...