37
Maintenance and Care
6
Maintenance and Care
General
Before proceeding to mainte-
nance and care work you are
advised to read and comply
with the Safety Information
chapter!
Compliance with the recommended
maintenance works will give you the
certitude of always having a reliable
machine at disposition.
Daily or weekly maintenance and repair
works may be executed by the driver/
operator having been trained accordin-
gly. Further Hako system maintenance
works have to be executed by qualified
personnel only. Please contact your lo-
cal Hako Service Centre or Hako con-
tract dealer. We cannot be held liable
for damages resulting from non-com-
pliance with these instructions.
Please indicate the machine's serial
number with any enquiry or spare part
order, see paragraph 1.7 - Nameplate.
6.1
Hako System Maintenance
The Hako System Maintenance:
• guarantees reliable operability of the
Hako machines (preventive mainte-
nance)
• minimizes operating costs, repair
costs and maintenance costs
• ensures long service life and opera-
bility of the machine
The Hako System Maintenance is
structured in separate modules and de-
termines specific technical works to be
executed as well as the intervals for
such maintenance works. For any spe-
cific maintenance type, the replacement
parts are determined and listed in spare
part kits.
Hako System Maintenance K:
To be performed by the customer in ac-
cordance to the maintenance and care
instructions contained in the operating
instructions (daily or weekly). The
driver/operator will be instructed upon
delivery of the machine.
Hako-System Maintenance I :
(after 50 hours of operation - einmalig)
Gilt für Maschinen mit verbrennungs-
motorischem Antrieb, 1. Ölwechsel, Fil-
ter usw. Durchführung vom
Sachkundigen eines autorisierten
Hako-Service-Stützpunktes.
Hako-System Maintenance II:
(every 125 hours of operation)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit.
Hako-System Maintenance III:
(every 250 hours of operation)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit.
Hako-System Maintenance S:
(every 500 hours of operation safety
check)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit. Execution of all safety-relevant
inspections according to UVV-BGV-
TÜV-VDE as prescribed by law.
6.2
Maintenance document
37
Maintenance and Care
6
Maintenance and Care
General
Before proceeding to mainte-
nance and care work you are
advised to read and comply
with the Safety Information
chapter!
Compliance with the recommended
maintenance works will give you the
certitude of always having a reliable
machine at disposition.
Daily or weekly maintenance and repair
works may be executed by the driver/
operator having been trained accordin-
gly. Further Hako system maintenance
works have to be executed by qualified
personnel only. Please contact your lo-
cal Hako Service Centre or Hako con-
tract dealer. We cannot be held liable
for damages resulting from non-com-
pliance with these instructions.
Please indicate the machine's serial
number with any enquiry or spare part
order, see paragraph 1.7 - Nameplate.
6.1
Hako System Maintenance
The Hako System Maintenance:
• guarantees reliable operability of the
Hako machines (preventive mainte-
nance)
• minimizes operating costs, repair
costs and maintenance costs
• ensures long service life and opera-
bility of the machine
The Hako System Maintenance is
structured in separate modules and de-
termines specific technical works to be
executed as well as the intervals for
such maintenance works. For any spe-
cific maintenance type, the replacement
parts are determined and listed in spare
part kits.
Hako System Maintenance K:
To be performed by the customer in ac-
cordance to the maintenance and care
instructions contained in the operating
instructions (daily or weekly). The
driver/operator will be instructed upon
delivery of the machine.
Hako-System Maintenance I :
(after 50 hours of operation - einmalig)
Gilt für Maschinen mit verbrennungs-
motorischem Antrieb, 1. Ölwechsel, Fil-
ter usw. Durchführung vom
Sachkundigen eines autorisierten
Hako-Service-Stützpunktes.
Hako-System Maintenance II:
(every 125 hours of operation)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit.
Hako-System Maintenance III:
(every 250 hours of operation)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit.
Hako-System Maintenance S:
(every 500 hours of operation safety
check)
To be performed by qualified personnel
of authorised Hako Service Centre in
accordance with the machine-specific
system maintenance including spare
part kit. Execution of all safety-relevant
inspections according to UVV-BGV-
TÜV-VDE as prescribed by law.
6.2
Maintenance document
Содержание Jonas 1200 V
Страница 1: ...Instruction Manual Hako Jonas 1200 V D 6300 10 6300 20...
Страница 12: ...12 Safety information Fig 1 1 2 10 3 4 5 6 7 8 9 9 11 12 13 13 Safety information 10 9 9 11 13 13...
Страница 13: ...13 Safety information Fig 2 2 1 9 4 5 6 3 6 7 8 Safety information 5 6 3 8...
Страница 22: ...22 Operation Operation...
Страница 38: ...36 5 5...
Страница 67: ......