6
Overhead guard
1.4.1 B 260 R - drill new bore holes
1. Drill two new bore holes (Fig. 4/1).
2. Position the rear spar on the left in
the direction of travel in front of the
new drill holes.
3. Attach each of the rear bar
to the chassis with two M10x20 hex
screws and the SKM 10 detent edge
washers (tighten
finger-tight) (Fig. 4/2).
Fig. 4
1
2
Содержание 7181.05
Страница 1: ...Assembly manual Overhead guard 7181 05 ...
Страница 9: ......