1-26
1.
Overview
V-SFT Ver. 6 Settings
Make settings on [Hardware Setting]
[PLC Properties]. The differences with respect to a 1 : 1 connection and the points
where caution is required are explained here.
For details on other settings, refer to Hardware Settings in “ 1 : 1 Connection” (page 1-8).
PLC Properties
Item
Contents
Communication
Setting
Connection Mode
Multi-link2 (Ethernet)
Multi-link2
(Ethernet)
Local Port No.
1:
Master
2 to 32: Slave
* Note that if the port number specified is the same as that already set for another V9
unit, the system will not operate correctly.
Send Delay Time
Specify a delay time that elapses before V9 sends the next command after receiving data
from the PLC. Normally use the default setting (0).
Total
2 to 32
Set the total number of V9 units connected in the multi-link2 (Ethernet) connection.
The setting must be the same as other V9 series on the same communication line.
Retry Cycle
Valid only when the local port is “1” (master).
Set the number of cycles before the master sends an inquiry for restoration to a slave that
has a communication problem (= system down). When a slave has a problem, it is
temporarily removed from the communication targets, and the master sends an inquiry for
restoration every number of cycles specified for [Retry Cycle].
This setting does not affect the communication speed if no problem is occurring on the
slave; however, if there is any problem, it does affect the communication speed.
When the setting value is small:
Restoration will not take long.
When the setting value is large:
Restoration will take a longer time.
LAN Port No.
Set a value in the range from 1024 to 65535 (excluding 8001 and 8020).
Default: 64000
* Set the same port number for all master and slave stations.
Multi-link2 (Ethernet)
Table
Click [Setting] to display the [Multi-link2 (Ethernet) Table] window.
For details on settings, refer to the next section.
PLC
MONITOUCH
Send delay time “t”
Содержание Monitouch V9 Series
Страница 76: ...1 64 1 Overview Please use this page freely...
Страница 77: ...2 1 PLC Connection 2 ALLEN BRADLEY...
Страница 119: ...2 42 2 ALLEN BRADLEY Please use this page freely...
Страница 120: ...3 1 PLC Connection 3 Automationdirect...
Страница 131: ...4 1 PLC Connection 4 2 Temperature Controller Servo Inverter Connection 4 Azbil...
Страница 164: ...5 1 PLC Connection 5 Baumuller...
Страница 169: ...6 1 PLC Connection 6 BECKHOFF...
Страница 174: ...7 1 Temperature Controller Servo Inverter Connection 7 CHINO...
Страница 193: ...8 1 PLC Connection 8 CIMON...
Страница 206: ...9 1 PLC Connection 9 DELTA...
Страница 211: ...10 1 Temperature Controller Servo Inverter Connection 10 DELTA TAU DATA SYSTEMS...
Страница 222: ...11 EATON Cutler Hammer 11 1 PLC Connection...
Страница 227: ...12 1 PLC Connection 12 EMERSON...
Страница 232: ...13 FANUC 13 1 PLC Connection...
Страница 238: ...13 6 13 FANUC Please use this page freely...
Страница 239: ...14 Fatek Automation 14 1 PLC Connection...
Страница 245: ...14 6 14 Fatek Automation Please use this page freely...
Страница 246: ...15 1 PLC Connection 15 FUFENG...
Страница 252: ...15 6 15 FUFENG Please use this page freely...
Страница 253: ...16 Fuji Electric 16 1 PLC Connection 16 2 Temperature Controller Servo Inverter Connection...
Страница 357: ...16 104 16 Fuji Electric Please use this page freely...
Страница 358: ...17 1 Temperature Controller Servo Inverter 17 Gammaflux...
Страница 364: ...17 6 17 Gammaflux Please use this page freely...
Страница 365: ...18 GE Fanuc 18 1 PLC Connection...
Страница 380: ...19 1 PLC Connection 19 Hitachi...
Страница 394: ...19 14 19 Hitachi Please use this page freely...
Страница 395: ...20 1 PLC Connection 20 2 Temperature Controller Servo Inverter Connection 20 Hitachi Industrial Equipment Systems...
Страница 423: ...20 28 20 Hitachi Industrial Equipment Systems Please use this page freely...