background image

ISOLGUARD HIG93, HIG93/L, HIG94 

 

  V5.8/23 

HAKEL spol. s r.o. Hradec Králové                     

www.hakel.com

                                                               

Page 7 / 15 

Napájení
230 V AC

Systém IT, Uit = max.275V AC

Nadřízený systém
(PC, PLC)

+

12

V

T

E

S

T

A

1

A

2

P

E

HAKEL

ISOLGUARD

HIG93/94

C

E

N

T

R

E

SH

B

A

ON

FAULT2

FAULT1

S1

S2

S3

SH

B

A

FAULT2

FAULT1

MENU

1

2

3

4

5

6

L1'

L2'

PE

L

N

TEST

L1'

L2'

PE

ALARM 2

ALARM 1

RS485
ISOLGUARD

PE

Napájení
230 V AC

Systém IT, Uit = max. 3x400V AC

Nadřízený systém
(PC, PLC)

+

12

V

T

E

S

T

A

1

A

2

P

E

HAKEL

ISOLGUARD

HIG93/94

C

E

N

T

R

E

SH

B

A

ON

FAULT2

FAULT1

S1

S2

S3

SH

B

A

FAULT2

FAULT1

MENU

1

2

3

4

5

6

PE

L1

L1'

L2'

PE

L2

L3

N

L3'

TL400

L1

L2

L3

CENTRE

Rtl.ext.

TEST

ALARM 2

ALARM 1

RS485
ISOLGUARD

PE

4.  Recommended connection of HIG93, HIG93/L, HIG94 to the monitored IT power 

supply system 

Single-phase IT power supply system (maximum 275 V AC), HIG93, HIG93/L, HIG94 modules with alarm signalling 
and with the remote test push-button 
 
 
 
 
 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

Picture 2: Connection of HIG93/94 device  
    in the 1-phase IT power supply system 

 

Three-phase IT power supply system (3x440 V AC), modules HIG93, HIG93/L, HIG94 with alarm signalling and with 
the remote test push-button 

 
 
 
 
 
 
 
 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

Picture 3: Connection of HIG93/94 device 
                in the 3-phase IT power supply

 

Содержание ISOLGUARD HIG93

Страница 1: ...LGUARD HIG93 HIG93 L HIG94 V5 8 23 HAKEL spol s r o Hradec Kr lov www hakel com Page 1 15 Insulation monitoring device ISOLGUARD HIG93 HIG93 L HIG94 Operating instructions Document s name DOK 70915 V5...

Страница 2: ...ion 5 Picture 2 Connection of HIG93 94 device 7 Picture 3 Connection of HIG93 94 device 7 Picture 4 Displayed information 8 Picture 5 Insulation resistance fault evaluation 11 Picture 6 Insulation sta...

Страница 3: ...1 1 Variants of devices ISOLGUARD HIG93 HIG93 L HIG94 Type Display Menu Signalling relay 1 Signalling relay 2 Range of displayed value Critical insulation resistance Communication bus bar MDS D connec...

Страница 4: ...c Outputs Two signalling relays with switching contact electric strength to the internal circuits electric strength to the supply circuits 250 V AC 1 A 3750 Vrms 3750 Vrms Communication line RS485 typ...

Страница 5: ...u is shown on the display When the insulation resistance Risol is viewed it activates the parameter setting menu Within the parameters setting menu the prolonged pressing of this push button terminate...

Страница 6: ...connections of the insulation monitoring Device Terminals A B SH These terminals are intended for connection of galvanic isolated communication line ISOLGUARD RS485 Individual insulation monitoring de...

Страница 7: ...FAULT2 FAULT1 S1 S2 S3 SH B A FAULT2 FAULT1 MENU 1 2 3 4 5 6 PE L1 L1 L2 PE L2 L3 N L3 TL400 L1 L2 L3 CENTRE Rtl ext TEST ALARM 2 ALARM 1 RS485 ISOLGUARD PE 4 Recommended connection of HIG93 HIG93 L...

Страница 8: ...C SET Relay Logic ESC SET N C FAULT ESC SET Picture 4 Displayed information 5 Information on the display Operating principles The meaning of the push buttons in each menu is shown on the display Press...

Страница 9: ...ation line is performed immediately after receiving the order and takes 5 seconds If the FAULT memory is set Mem FAULT menu the signal relay remains in a status of alarm indication even after the test...

Страница 10: ...label as Rin Typical values for three phase HAKEL inductors are as follows TL400 4 5 k TL500 4 5 k TL600 4 5 k TL1600 12 5 k TL6003 19 6 k Exact values may be obtained by measuring the inductor s wind...

Страница 11: ...LT2 is only terminated when the insulation resistance increases above the value Rcrit1 Rhyst or Rcrit2 Rhyst Signalling relay is released and FAULT1 FAULT2 signalling is terminated The following left...

Страница 12: ...assigned by the MASTER station In practice the communication proceeds in such a way that the MASTER station sends requests subsequently to all connected units and the SLAVE stations response The acces...

Страница 13: ...nt data determining the status of this measurement e g fault occurrence Parameter data are extended of priority character determining the importance of the set parameter This character divides paramet...

Страница 14: ...20 20 20 Delay in response of signalling the fault Set tON tON 0 sec 0 sec 0 sec External inductor resistance Set TLext Rtl ext 0 k 0 k 0 k Delay in device test start by remote test button Set tTEST t...

Страница 15: ...and service It is necessary to follow specified conditions for reliable operation do not expose the device to rough handling keep it clean and ensure maximum admissible temperature of the environment...

Отзывы: