INSTALLATION INSTRUCTIONS
4
.
Install the main unit and chimney (this requires 2 persons)
● Install the main unite to the wall plate. Make sure the unite is placed correctly.
(Fig.6) Place the chimney to the correct position, mark the holes positons. Put
the cooker hood down, drill holes on the marks. Put the main unit back in place.
Install the chimney with 2*40cm self tapping screws (Fig.7).
7
3
.
Fix the chimney to the main unite
● Install 2pcs of self tapping screws to the mounting plate at the botton of the
chimney, tighten the screws, make sure the botton of the chimney is well
attached to the main body.
●
Fix the other 2pcs of self tapping screws to the top of the chimney.
4*10mm
self tapping screws
Fig.5
2*40cm self tapping screws
Fig.6
Fig.7