CONNECT SERIES SERVICE MANUAL
71
ENGLISH
Maintenance
Compressor/Gas Liquid Separator Removal
Note: Be sure power is isolated and refrigerant is recovered before removing the gas liquid separator.
Step
Picture
Work instruction
4. Install the new gas liquid
separator
Install the gas liquid separator by
referring to the positions of entering
and leaving pipes. Braze the two
joints
Nitrogen welding: the pressure of
nitrogen is 2” to 3” W.C
Note: When brazing the pipes, do
not let the flame burn the other
components.
Tighten the screws of gas liquid
separator.
5. Secure the electric box and
Put the electric box back in place
and tighten up the screws.
Arrange the wires as original.
6. Check and open the upper
and side panels.
Check whether each component and
connection wire is well connected.
If everything is OK, install the upper,
left and right panels. Tighten up the
screws.
Содержание GE APPLIANCES Connect Series
Страница 13: ...CONNECT SERIES SERVICE MANUAL 11 ENGLISH Troubleshooting Model AUH4860ZGDA ...
Страница 22: ...CONNECT SERIES SERVICE MANUAL 20 ENGLISH Troubleshooting AUH4860ZGDAA ...
Страница 84: ...CONNECT SERIES SERVICE MANUAL 82 ENGLISH Maintenance AUH4860ZGDA ...
Страница 86: ...CONNECT SERIES SERVICE MANUAL 84 ENGLISH Maintenance IDU Exploded View and Parts Lists UUY24ZGDAA UUY36ZGDAA ...
Страница 96: ...CONNECT SERIES SERVICE MANUAL ENGLISH Appendices 94 ...
Страница 97: ...CONNECT SERIES SERVICE MANUAL 95 ENGLISH Appendices ...
Страница 98: ...CONNECT SERIES SERVICE MANUAL 96 ENGLISH Appendices ...
Страница 99: ...CONNECT SERIES SERVICE MANUAL 97 ENGLISH Appendices ...
Страница 101: ......