ENGLISH
INSTALL SIDE CURTAINS
NOTE:
Attach side curtains to the air conditioner before placing the unit in the window.
1.
e
c
a
l
P
the tabbed side of the side curtain in
the track on the right-hand side of the air conditioner cabinet.
(See Fig.9)
2.
e
d
il
S
the tabbed side of the side curtain down over
all 3 tracks until the curtain is aligned with the top and bottom
of the air conditioner cabinet.
(See Fig.11)
3.
e
d
il
S
the side curtain frame over the top of the side curtain, then
into the channel on the top of the air conditioner and
into the track on the bottom of the air conditioner.
(See Fig.12)
4.
e
d
il
S
the side curtain frame as close to the air
conditioner cabinet as necessary to lock the side
curtain to the frame. Gently press the frame until
it clicks.
(See Fig.10 & Fig.12)
5. Repeat above steps for the left-hand side curtain
and frame. Make sure no gaps are left to ensure that
air does not escape into or out of the room.
HOW TO INSTALL
PAGE 11
PREPARING THE AIR CONDITIONER cont.
TABBED SIDE OF
SIDE CURTAIN
LOCK EDGE SIDE
OF SIDE CURTAIN
Fig. 9
Fig. 10
Fig. 11
CLICK
Fig. 12
6. Apply the weather seals provided to the bottom, top & sides
of the window to seal around the perimeter of the air
conditioner. (Fig 12-1 & 12-2)
Cut and apply a weather
strip to side of the
curtain frame.(One each
side)
Cut and apply weather
strip to back edge of
the window sill.
Fig. 12-2
Fig. 12-1
Cut and apply weather strip
to front and bottom edge
of window frame.
Содержание ESAQ406T
Страница 2: ......
Страница 28: ......
Страница 54: ......
Страница 80: ...Model ESAQ406T HWQ08XCT Issued Date September 2017 www Haierappliances com Haier Appliances Louisville KY 40225...