REMOVE PACKAGING MATERIALS
•
Remove
packaging
materials.
Save
the
carton
and
the
foam
packaging
for
storing
the
unit
when
not
in
use.
NOTE:
There
are
NO
internal
packing
materials
inside
the
air
conditioner
to
r
emove―Do
No
t
open
the
cabinet.
•
Handle
the
air
conditioner
gently.
•
Keep
the
air
conditioner
upright
and
level.
Do
not
set
the
air
conditioner
on
its
side,
front,
back
or
upside
down.
•
The
air
conditioner
must
be
standing
upright
for
2
hours
prior
to
installation
and
oper
ation.
INSTALL TOP CHANNEL
1.
Place
the
top
channel
on
the
top
of
the
air
conditioner,
lining
up
the
holes
in
the
top
channel
with
the
holes
in
the
top
of
the
unit.
Make
sure
the
channel
is
facing
forward
as
indicated
by
the
illustr
ations.
(See Fig.7 & 8)
2.
Using
3/8"
self-tapping
screws,
attach
the
top
channel
to
the
t
op
of
the
air
c
onditioner.
(See Fig.8)
Use four (4) 3/8" self-tapping screws for models:
ESAQ406T HWQ08XCT
UNPACKING THE AIR CONDITIONER
PREPARING THE AIR CONDITIONER
ENGLISH
EXCESSIVE WEIGHT HAZARD
When
moving
or
lifting
the
air
conditioner,
use
two
or
more
people.
W
ear
gloves
when
handling
the
air
conditioner
to
protect
against
possible
sharp
edges
and
metal
fins.
WARNING
PAGE 10
HOW TO INSTALL
Fig. 7
Fig. 8
Top
Channel
3/8"
Screw
(Actual
Size)
Front
Содержание ESAQ406T
Страница 2: ......
Страница 28: ......
Страница 54: ......
Страница 80: ...Model ESAQ406T HWQ08XCT Issued Date September 2017 www Haierappliances com Haier Appliances Louisville KY 40225...