Installation procedure
16
3. Attaching Drain-Elbow
If the drain-elbow is used, please attach it as figure.
Flare nut
Half union
Torque wrench
Spanner
2. Connection of pipe
Apply refrigerant oil on half union and flare nut.
To bend a pipe, give the roundness as large as possible not to crush the pipe.
Connecting the pipe of gas side firstly makes working easier.
1. Selection of pipe
To this unit, both liquid and gas pipes shall be insulated as they become low temperature in operation.
Use optional parts for piping set or pipes covered with equivalent insulation material.
Refrigerant piping work
Pipe Diameter (
)
Fastening Torque
Liquid Side 6.35mm (1/4'')
18N.m
Gas Side 9.52mm (3/8'')
50N.m
Liquid pipe
Gas pipe
6.35mm ( 1/4'' ) x 0.8mm
9.52mm ( 3/8'' ) x 0.8mm
Forced fastening without careful centering may damage the threads and cause a leakage of gas.
Содержание AU182XFERA
Страница 2: ......
Страница 9: ...Unit appearance AU252XGERA AU182XFERA AU222XFERA AU282XHERA AU342XHERA AU362XHERA 1 ...
Страница 33: ......
Страница 34: ......